Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 27, 2026 at 8:00 PM
Updated May 16, 2026
This is a service / maintenance or supply contract in Waterford, Michigan. Contact the soliciting agency for additional information.
Reference Number 0000421321 Purchase Type Duration: 1-3 years Option: Possible 2 year extension The office of the Oakland County Water Resources Commissioner (WRC) is a countywide elected office currently held by Jim Nash. The office is made up of approximately 370 employees who are responsible for the management of stormwater, drinking water, and wastewater services for residents throughout Oakland County. WRC performs operations and maintenance services for 22 local municipalities and numerous county and inter-county drains also including construction, asset management, environmental regulations, public education, water and sewer rate development, customer billing, and emergency services. The WRC is a regional leader on high-impact regional water service delivery projects. Oakland County Purchasing is requesting bids for a 3-year blanket contract on behalf of the Water Resource Commissioners office for Gardner Denver blower parts as specified below for our Walled Lake/Novi Wastewater Treatment facility and Clinton River Water Resource Recovery Facility, on an as-needed basis. Oakland County Water Resources Commissioner (WRC) operates and maintains the Walled Lake/Novi and Clinton River wastewater treatment facilities. Both facilities rely on Gardner Denver blowers to provide critical aeration for sewage treatment processes. To ensure continuous and reliable operation, the WRC requires the replacement of various lower components and, when necessary, complete blower units on an as-needed basis. These Gardner Denver blowers are essential to maintaining proper treatment performance and regulatory compliance at both facilities. Any failure or interruption in the blower operation could significantly impact system functionality and treatment effectiveness. Facility Locations Walled Lake/Novi Wastewater Treatment Facility - 46351 West Rd, Novi MI 48377 Clinton River Water Resource Recovery Facility - 155 North Opdyke Rd., Pontiac MI 48342 Additional locations may be added during the duration of the contract with approval from both parties. Brand/Model Brand Name Only Manufacturer: Gardner Denver Model: Lamson Series 850 model 858 AD and Hoffman model 75106A Additional models may be added during the duration of the contract. Specs The WRC is seeking the following: Full Catalog Pricing list(s) Contractors must submit their catalog for parts to WRC for 2026, 2027 and 2028. Items not included in the price list may be quoted and ordered separately throughout the duration of the contract. The awarded vendor must be able to provide a quote with shipping included. Provide warranty information for Gardner Denver blower parts Shipping must be included in the price list Discount(s) off Orders: _________% Note: Oakland County WRC is tax exempt and can provide necessary documentation upon bid award. If applicable, please provide pricing with a government discount. All pricing shall be firm and fixed for the initial 3 years. Rates can increase for an optional fourth or fifth year with valid justification. No additional surcharges or tariffs shall be permitted during the duration of the contract. Buyer Preferences, Guidelines & Requirements General Requirements - FOB Destination Question Deadline 05/01/2026 at 10:00 AM ET Questions are submitted online Yes
Post-Bid
Water / Sewer
Public - County
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2026
June 8, 2026
Multiple Locations, Waterford, MI
Related To This Project
Waterford, MI
Bid Date: May 11 2026
Waterford, MI
Bid Date: Jun 02 2026
Waterford, MI
Bid Date: May 07 2026
Waterford, MI
Bid Date: Mar 26 2026
Waterford, MI
Bid Date: Mar 26 2026
Waterford, MI
Bid Date: Mar 31 2026
Waterford, MI
Bid Date: Mar 10 2026
Waterford, MI
Bid Date: Mar 03 2026
Waterford, MI
Bid Date: Mar 20 2026
Waterford, MI
Bid Date: Mar 27 2026
Waterford, MI
Bid Date: Mar 13 2026
Waterford, MI
Bid Date: Feb 10 2026
Waterford, MI
Bid Date: Feb 05 2026
Waterford, MI
Bid Date: Jan 20 2026
Waterford, MI
Bid Date: Jan 20 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
