Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 26, 2026 at 8:00 PM
Updated May 20, 2026
This is a service / maintenance or supply contract in Deatsville, Alabama. Contact the soliciting agency for additional information.
The project requires a single qualified firm to provide preventive (scheduled) and corrective (unscheduled) maintenance services at the Governor Kay Ivey Correctional Complex for the Alabama Department of Corrections. The selected firm shall furnish all labor, supervision, materials, tools, supplies, and equipment necessary to provide facility maintenance services for the duration of the contract. Services must maintain the complex, grounds, buildings, and all associated systems and infrastructure at the condition in which they are provided to the awarded firm upon contract execution. The scope includes complex property, grounds and landscaping, security fencing, site utilities and distribution systems, emergency generator(s), central utility plant systems, security and detention systems, plumbing and sewer, building envelope and structure, roofing, erosion, cameras, locking control systems, security and commercial doors, hardware and keying, heating, ventilation, and air-conditioning (HVAC), fire alarm, fire sprinkler and fire suppression, electrical systems and lighting, low voltage systems, kitchen equipment, laundry equipment, natural gas distribution and combustion systems, pest control, furniture, fixtures, and equipment (FF&E), and other items as outlined in the documents and specifications. Pre-qualification requirements: Prequalification proposals must be submitted via email as directed. Requirements and a non-disclosure agreement may be obtained from the Architect by written request on the Contractor’s company letterhead. Only prequalified bidders who have signed a non-disclosure agreement are eligible to receive bid documents. All bidders must comply with the State Licensing Board for General Contractors and be licensed under the Provisions of Title 34, Chapter 8, Code of Alabama. Bidders must show evidence of license on the outside of the sealed envelope and on the proposal form. A cashier’s check or bid bond in an amount not less than five percent of the bid, but not more than $10,000, must accompany the proposal. Performance and statutory Labor and Material Payment Bonds, required insurance, and verification of E-Verify enrollment will be required at contract signing. Attendance at the mandatory pre-bid conference is required. Additional qualifications may be outlined in the bid and contract documents. Bids from prequalified bidders who do not attend the pre-bid conference will be rejected. All attendees, including subcontractors, must have executed non-disclosure agreements prior to the conference. This project is bid excluding taxes and requires compliance with Act 2013-205 regarding tax exemption certificates. Additional requirements for subcontractors and manufacturers may be indicated in the bid and contract documents.
GC Bidding
Jails / Prisons
$5,000,000.00
Public - State/Provincial
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
