Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 26, 2026 at 8:00 PM
Updated March 27, 2026
Site work and paving for a mixed-use development in Hazel Green, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Limit : W Troy Street to N Jackson Street The pavement needs to be replaced Perpetuation project to replace the pavement of approximately 1.15 miles of STH 80 from Troy St. to Jackson St. in the City of Cuba City in Grant County. Design a full depth pavement replacement including the underlying base materials, curb and gutter replacement, storm sewer replacement, full sidewalk replacement along corridor and curb ramp reconstruction to meet ADA compliance Anticipated Construction Cost: $5,000,000-$5,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Hazel Green - Platteville *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$5,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
WI-80, Hazel Green, WI
Related To This Project
Hazel Green, WI
Bid Date: Jul 16 2025
Hazel Green, WI
Bid Date: May 15 2025
Hazel Green, WI
Bid Date: Dec 12 2024
Hazel Green, WI
Bid Date: Sep 19 2024
Hazel Green, WI
Bid Date: Jul 16 2024
Hazel Green, WI
Bid Date: Jul 16 2024
Hazel Green, WI
--
Hazel Green, WI
--
Hazel Green, WI
Bid Date: Mar 05 2021
Hazel Green, WI
Bid Date: Feb 15 2023
La Crosse, WI
--
Port Edwards, WI
--
Kewaunee, WI
--
Fox Lake, WI
Bid Date: Apr 29 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
