Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 27, 2026 at 8:00 PM
Updated March 28, 2026
Site work and paving for a civil project in Black Creek, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
Limit : I-41 MAINLINE, HOLLAND-CTH N, STH 55 INTCHG, I-41 MAINLINE, CTH N - CTH JJ, MALONEY RD Construction engineering for the modernization of the IH 41 Corridor in the village of Little Chute, town of Vandenbroek, city of Kaukauna and town of Kaukauna in Outagamie County. Modernization of 2.254 miles of IH 41 from Holland Road to CTH N. Existing IH 41 will be reconstructed and expanded from four lanes to six. The project includes two box culverts, three polymer overlays (B44-0330, B44-0331, B44-0332) and five sign structures. Modernization of 3.277 miles of the IH 41 from CTH N - CTH JJ. Existing IH 41 will be expanded from four to six lanes. The project includes four bridges, one box culvert, one noise wall, and ten sign structure, two temporary bridge widenings (B44-0041, B44-0043), and four polymer overlays (B44-0333, B44- 0338, B44-0341, B44-0342). Modernization of .166 miles of the STH 55 Interchange. Existing STH 55 will be modified. The project includes one sign structure. Modernization of .099 miles of Maloney Road. Existing Maloney Road will be reconstructed between Emery Lane and Prospect Lane. Anticipated construction from January 2027 to July 2030 with shoulder, ramp off peak lane, and nighttime short-term closures. Anticipated Construction Cost: $45,000,000 OR GREATER The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Appleton - De Pere
Conceptual
Roads / Highways
$45,000,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 4, 2027
WI 41, Black Creek, WI
Related To This Project
Black Creek, WI
Bid Date: May 18 2026
Black Creek, WI
--
Black Creek, WI
Bid Date: Mar 10 2026
Black Creek, WI
--
Black Creek, WI
Bid Date: Nov 11 2025
Black Creek, WI
Bid Date: May 13 2025
Black Creek, WI
Bid Date: Feb 10 2026
Black Creek, WI
Bid Date: May 13 2021
Black Creek, WI
Bid Date: Feb 15 2022
Black Creek, WI
Bid Date: Jul 21 2023
Black Creek, WI
Bid Date: Jul 11 2023
Black Creek, WI
Bid Date: Oct 03 2022
Black Creek, WI
Bid Date: Jul 11 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
