Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 27, 2026 at 8:00 PM
Updated March 28, 2026
Site work and paving for a civil project in Black Creek, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
Limit : I-41 MAINLINE, MINERS-L. RAPIDS RD, I-41 MAINLINE, L. RAPIDS-N.LIMITS, I-41 MAINLINE, MINERS-N. LIMITS, CTH S INTERCHANGE Construction engineering for the modernization of the IH41 Corridor from Miners Way to North Limits and reconstruction of the CTH S Interchange in the town of Lawrence in Brown County. Modernization of 2.324-miles of IH41 from Miners Way to Little Rapids Road. Existing IH41 will be reconstructed and expanded. The project includes five sign structures, concrete pavement, and perpetual asphalt pavement. Modernization of 2.415-miles of IH41 from Little Rapids Road to North Limits. Existing IH41 will be reconstructed and expanded. The project includes three sign structures, two bridges, one noise barrier and concrete pavement. TMP project in preparation for the modernization of 4.739-miles of IH41 from Miners Way to North Limits. The project will widen I-41 SB and perform EBS in the I-41 Median. The project also includes two box culverts. Modernization of the CTH S interchange and 0.67 miles of CTH S. Project includes three multi-lane and one single-lane roundabouts. The project also includes one bridge, one box culvert, stream realignment and multiple sign structures. IH41 will have shoulder, ramp, off peak lane, and nighttime short term full closures. Night work anticipated. The CTH S Interchange, CTH S and frontage roads will be closed when construction. Anticipated Construction Cost: $45,000,000 OR GREATER The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Appleton - De Pere - IH 041N
Conceptual
Roads / Highways
$45,000,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 9, 2027
WI 41, Black Creek, WI
Related To This Project
Black Creek, WI
--
Black Creek, WI
Bid Date: May 18 2026
Black Creek, WI
Bid Date: Mar 10 2026
Black Creek, WI
--
Black Creek, WI
Bid Date: Nov 11 2025
Black Creek, WI
Bid Date: May 13 2025
Black Creek, WI
Bid Date: Feb 10 2026
Black Creek, WI
Bid Date: May 13 2021
Black Creek, WI
Bid Date: Feb 15 2022
Black Creek, WI
Bid Date: Jul 21 2023
Black Creek, WI
Bid Date: Jul 11 2023
Black Creek, WI
Bid Date: Oct 03 2022
Black Creek, WI
Bid Date: Jul 11 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
