BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a mixed-use development in Quitman, Mississippi. Completed plans call for site work for a transportation facility; and transportation facility.

Principal items of work include installation of trenching for direct buried cable (9,000 L.F.), underground cable #8 AWG 5KV L-824C (8,000 L.F.), #6 AWG solid bare counterpoise installed in trench (9,370 L.F.), underground cable #6 AWG 600V XHHW-2 (5,700 L.F.), underground cable #8 AWG 600V XHHW-2 (2,100 L.F.), L-861 stake mounted runway edge lights (34 E.A.), L-861 stake mounted runway threshold lights (12 E.A.), L-861 stake mounted taxiway edge lights (20 E.A.), 1-2" directional bore (370 L.F.), L-881 (L) PAPI 2-Box LED on new foundation (1 L.F.), construction of metal housing and foundation (1 L.S.), and installation of equipment in metal housing (1 L.S.). Contract time is 120 working days. The award will be made to the lowest and best bid based on bid offer, technical qualifications, and professional reputation. Certified check or bid bond for five percent (5%) of the total bid is required. Bids must be physically delivered and will not be considered if qualified by additional conditions. All items must be constructed to FAA standards. Minority business enterprises will be afforded full opportunity and not discriminated against on the grounds of race, color, or national origin in consideration for an award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Transportation Terminals

$400,000.00

Public - County

Site Work

21

12

8

8

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
43
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2026

May 27, 2026

Project location map

429 County Road 153, Quitman, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.