BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a civil project in Edmonton, Alberta. Completed plans call for site work for a water / sewer project.

The major components of the general construction contract include the following: Forcemain Investigation Work Hydrovac and clean the existing lift station, confirm all invert elevations, confirm pipe diameters, and confirm dimensions of lift station barrel including depth and width depth Forcemain pipe SDR, material designation and pipe pressure rating must be confirmed before proceeding with the upgrades. Contractor must expose the forcemain to obtain this information and submit to engineer for review. The location to be exposed should where the new cleanout/bypass chamber is proposed. South Lift Station Upgrades Remove vegetation and overgrowth at lift station site Resurfacing of existing gravel road and access road extension New concrete pad to support backup power generator and electrical equipment Restoring surface and grading of the lift station site Installation of a new cleanout/bypass chamber New submersible pumps, pump removal rails and related accessories New process piping, valves and instrumentation New power and control system New backup power generator South Wastewater Lagoon Upgrades Pumping down existing anaerobic cell and diversion of flow to the other anaerobic cell to facilitate work of berm repair and installing new concrete structure Removal of the existing septage pipe and concrete pad New concrete septage receiving chute on top of restored berm surface and new concrete truck pad Site grading and surface restoration to build-up of access area for truck access Supply and installation of all related civil, structural, process mechanical, HVAC and plumbing, electrical, instrumentation and control works Programming and SCADA integration work Electrical/instrumentation/control system upgrades and improvements to the existing wastewater lift station Quality Control Testing by Independent Inspection and Testing Agencies, paid for by the Contractor, to ensure construction is completed in accordance with the Contract Documents and to all recommendations of the Geotechnical Investigation Report Field Testing, Pre-Start-up, Start-up, Operation and Maintenance Manuals, Commissioning, Training, and Warranty Services Documents can be obtained from https://m2eng.bidsandtenders.ca/ Question Deadline 04/15/2026 at 4:00 PM MT

Post-Bid

Water / Sewer

$500,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
50
Bidding Soon
403
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

June 1, 2026

Project location map

Multiple Locations, Edmonton, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.