BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2026 at 8:00 PM

Updated May 20, 2026

Site work, paving and outdoor lighting for a mixed-use development in Stuart, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and municipal facility.

The Improvements under this Contract consist of, but are not limited to, MOT (standard, special detour, ped detour, traffic officer, business sign, low-profile barrier, ped LCD, separator, PCMS, arrow board, signalization, traffic detection, barricade), environmental barrier (sediment, inlet), monitor structures (inspection, settlement, vibration), clear/grub (standard, selective), earthwork (excavation), concrete (removal, curb, curb/gutter, valley/shoulder gutter, separator, sidewalk, driveway, ditch), asphalt (misc., stabilization, base, milling, resurfacing, grooving), pavement markings (detectable, RPM, rumble strip, painted, thermoplastic, tape), signing (object marker, tubular marker, sign strip, panel remove, single-column, multi-column), signalization (cable, prestressed pole, aluminum pole pedestal, aluminum pole remove, vehicular signal, signal auxiliaries, ped signal, ped detector, controller modify), Traffic Monitoring Site (vehicle sensor and inductive loop assemblies), drainage (inlet, manhole, pipe culvert, MES), tree (protection, root/branch pruning, root bridging, relocate), conduit, pull/splice box, electrical (power service), mailbox, and sod along State Road 5 (US-1/Federal Highway) from State Road A1A (SE Dixie Highway) to SE Osprey Street, for 5.105 miles in unincorporated Martin County. Total Roadway Length: 5.068 Miles Total Bridge Length: 0.037 Miles Total Proposal Length: 5.105 Miles Special Start Date: N/A Question Deadline Apr 22, 2026 at 5:00 PM ET, Direct all questions to the Department by posting them to the Department's website. Questions posted to this site before 5:00 P.M. (EST) on the tenth calendar day prior to the bid opening, will be responded to by the Department. For questions posted after this deadline, an answer cannot be assured. FDOT - 007 - Resurfacing - SR 5

Bid Results

Roads / Highways

$15,994,701.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

947

14

5

Subscribe For Documents

88 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2026

May 11, 2026

Project location map

SW Federal Hwy, Stuart, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.