BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a power facility in Tohatchi, New Mexico. Completed plans call for site work for a power facility.

Bids are requested for the construction and improvements of an electrical substation, including the supply of necessary labor and equipment for the Tohatchi Substation Improvements project located approximately 1.5 miles south of Tohatchi, New Mexico in McKinley County. Bidders must be familiar with Rural Utility Service (RUS) rules and regulations regarding the construction of RUS electric system structures. Each bidder is required to submit electronic bids with a security deposit as specified in the Instructions to Bidders, using a unit price basis with a fixed fee total. Attendance at a mandatory pre-bid meeting is required for all bidders. Bids will be evaluated based on cost, compliance with RUS requirements, and bidder qualifications. Preference will be given in accordance with applicable Navajo Nation statutes and requirements, and bidders should provide evidence of Preference Priority Certification if applicable. Construction must begin no later than 60 days after contract approval and be completed before the energization date. Liquidated damages may apply for delays.

Post-Bid

Power Plant

$5,000,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
13
Bidding Soon
111
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

June 7, 2026

Project location map

To be determined, Tohatchi, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.