Published August 24, 2026 at 8:00 PM
Updated August 29, 2026
Site work, paving and new construction of a mixed-use development in River Forest, Illinois. Working plans call for the construction of a 126,825-square-foot, 72-unit multi-residential development; five-story above grade retail development; and for paving for a 87-space sidewalk / parking lot.
https://www.forestparkreview.com/2026/08/18/5-story-building/ River Forest Village Board barely passes Madison Street development with 4-3 vote Seventeen of 18 residents speak against measure in public comment forum After more than five hours, 18 public comments and two breaks, the River Forest village board early Tuesday morning approved an ordinance to grant a planned development permit for a five-story residential and commercial building at 7620 Madison St. to be developed by Chicago-based Five Thirty-One Partners. Village trustees Katie Brennan, Erika Bachner and Megan Keskitalo voted against the measure, which was debated in front of about 60 residents at Trinity High School’s Fox Auditorium. Trustees Lisa Gillis, Robert O’Connell and Respicio Vazquez voted in favor, with Village President Cathy Adduci casting the deciding vote at roughly 12:30 a.m. BILL DWYER River Forest Village Administrator Matt Walsh makes a point about the Madison Street development project in his presentation to residents at Monday’s board meeting. The redevelopment would include construction of a mixed-use building with 69 high-end apartments and first-floor retail space. The five-story building would be 87 feet at its tallest point with the majority of the building just under 73 feet. The land sale price for the property is $10, with an incentive of up to $2 million in TIF-eligible reimbursement, with $1 million payable to the developer when a certificate of occupancy is granted. “While change naturally brings questions and concerns, we are confident that this development will be a positive addition to our community,” Adduci said before casting the deciding vote. “This project will expand our tax base, with new property and sales tax revenue. These funds will support village services and provide critical revenue for our schools, contributing to our efforts to stabilize our property taxes. The best way to keep up with Forest Park Sign up for our free newsletter to get the top news and local happenings. Email Address Sign up By clicking sign up, you agree to the terms. “My approval is based on several conditions discussed tonight, and my commitment to the surrounding neighbors and adjacent neighbors to get it right. We’re going to get it right.” Revision and conditions The vote was contingent upon a revision to the redevelopment agreement to require payment of 50% of permit fees upon permit issuance, and 50% due at certificate of occupancy, replacing a longer proposed payment schedule for Five Thirty-One Partners. More significantly, Adduci proposed several conditions for approval, including: Creation of a focus group to evaluate traffic and safety issues in the neighborhood around the development; Requirement of a post-construction occupancy traffic impact study; Replacement of lead service lines for residents on the 000 blocks of Ashland Ave. and Lathrop; Complimentary window-washing for homes on the block of the project after construction; Installation of security cameras on the property; Prohibition of construction parking on residential streets; and, Creation of a neighbor impact fund. Village Administrator Matt Walsh said Five Thirty-One would be responsible for infrastructure and connections for water and sewer. “The approval last night secured additional tax revenue for the village and its taxing bodies for decades to come, along with additional housing and retail options in River Forest,” Walsh said Tuesday morning. “The conditions placed on the approval improve the project and help the neighbors near the project site. We look forward to working with Five Thirty-One Partners to see the project through to completion.” Representatives from tax services firm Ryan, LLC projected generation of $25 million in property taxes between 2026 and 2056. Total tax benefit to Oak Park and River Forest High School District 200 would be $7.5 million and $11.4 million for River Forest School District 90. Resident pushback Still, remarks from residents during the meeting’s public comment portion cast doubt on the review and approval process, especially in light of the fact that the village’s development review board July 9 unanimously but conditionally recommended project approval to the board. “The DRB sat here for three hours, stoic; one person took notes,” said resident Bruce Faland. “A lot of this audience raised questions. “The decision was made before they sat down … They sat down for three hours and listened to questions, comments and everything. No questions were raised.” Regarding the building itself, former village trustee Patty Henek pointed out that “residents have consistently stated for years they do not desire a five-story dense building.” Two to four stories would be more appropriate for the location, she said. “Buildings of this height contribute to a sense of enclosure and an intimate and pedestrian scale,” she said. “Why does this no longer apply?” During the first break, Henek expanded on those thoughts. “I personally would like them to pause and take into consideration what everybody has said, in terms of it’s not really what the community wants,” she said. “We need to go back to the drawing board.” That didn’t happen. Another resident, Thomas Lamm, was more succinct. “This property is too small for five stories,” he said. Prior to Brennan’s no vote, she pointed out that the village also has to consider the anticipated September transfer of ownership and management of the River Forest Civic Center building to the village government. “I think it’s appropriate to consider all of our obligations,” Brennan said. Only one residential supporter Resident Kris Mackey, a member of the River Forest District 90 school board, was the only supporter among the 18 residents that spoke during the public comment section. “Because I think we need development, we need the revenue that can be counted on steadily going forward,” Mackey said post-meeting. “And not this stream. Other streams … the Sheraton, now the Sunrise. That was very important to this municipality. We hadn’t had anything for quite a while. “This has to be thoughtful and steady for this revenue to meet what we pay people, which always goes up. And should.” “Obviously, I’m happy, that was our goal,” said Five Thirty-One co-owner Viktor Jakovljevic, who himself spoke several times at the meeting, on his own behalf as a River Forest resident and also to answer board questions with fellow co-owner Chuck Westphal. “I think we’re going to do great in this community and ultimately at the end this project will be accepted by the community,” he said. “It was a fight, like every project, but I think it was the right decision.” But resident Greg Abcarian said after the meeting concluded that he was curious about the vote itself. “All four yeses have always voted yes together,” he said. “Always voted no together. They have never not voted against each other.” ------------------------------------------------------------------------------------------------------------------------- Plans call for a five-story mixed-use building includes 72 residential units above a ground-floor retail space, with a private roof deck, structured indoor parking, and surface parking accommodations. As of August 21, 2026, this project has received final approvals. A construction start date has not been disclosed.
Pre-Construction/Negotiated
Multi-Residential
$32,000,000.00
Public - City
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 28, 2026
7620 Madison St, River Forest, IL
Related To This Project
River Forest, IL
Bid Date: Jul 16 2026
River Forest, IL
Bid Date: Sep 01 2026
River Forest, IL
Bid Date: Aug 25 2026
River Forest, IL
--
River Forest, IL
Bid Date: Sep 01 2026
River Forest, IL
--
River Forest, IL
--
River Forest, IL
Bid Date: Jun 05 2026
River Forest, IL
Bid Date: May 28 2026
River Forest, IL
Bid Date: Jun 05 2026
River Forest, IL
Bid Date: Apr 08 2026
River Forest, IL
Bid Date: May 07 2026
River Forest, IL
Bid Date: Apr 03 2026
River Forest, IL
Bid Date: Feb 25 2026
River Forest, IL
Bid Date: Feb 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.