BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a transportation facility in Dallas, Texas. Completed plans call for site work for a transportation facility.

Questions Due Date: May 5th 2026, 5:00 PM CDT The Dallas Area Rapid Transit (DART) is issuing a Request for Qualifications (RFQ) to solicit responses from qualified firms capable of providing Progressive Design-Build (PDB) services for the Unified Signal System (USS) Project. The USS Project will modernize DART's Light Rail Transit (LRT) signal system for approximately 48 miles of alignment, including the Central Business District (CBD), Red Line, and Blue Line. The project includes upgrading existing segments (excluding the CBD segment) that currently use Automatic Block Signaling (ABS) and Line of Sight (LOS). These segments will transition to a Digital Track Circuit-based Automatic Train Protections (ATP) signal system with cab signaling. The new system upgrades will match the signaling functionality of the Green and Orange Lines. For the CBD section, the existing Transit Signal Priority (TSP) system will be upgraded with enhanced train detection and transit signal prioritization features. Additionally, this project will advance the reliability of the signal system by introducing redundant power upgrades at key locations. The 30% Design Deliverables for the USS Project have been made available here for review by potential respondents. Certain deliverables have been identified as containing Sensitive Security Information (SSI). These consist of the Preliminary Hazard Analysis, Threat and Vulnerability Assessment, and site condition reports with field photo logs. These will be made available for in-office review at DART facilities pending execution of a Non-Disclosure Agreement (NDA), or in accordance with DART's established procedures for handling SSI.

GC Bidding

Transportation Terminals

$850,000,000.00

Public - City

Site Work

3768

45

3

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

January 15, 2028

Project location map

Multiple Locations, Dallas, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.