BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 23, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Mountain View, Arkansas. Completed plans call for site work for a water / sewer project.

The project involves the rehabilitation of the sanitary sewer collection system. The scope of work includes pipe bursting of 2,581 linear feet of 6-inch existing clay sewer lines to 8-inch SDR 17 IPS HDPE, installation of 100 linear feet of 8-inch SDR 26 PVC by bore and open cut, installation of 139 linear feet of 10-inch SDR 26 PVC by open cut, installation of 90 linear feet of 20-inch HDPE encasement by bore, replacement of 3 sanitary sewer concrete manholes, bench repair for 11 sanitary sewer manholes associated with the pipe bursting, pre and post CCTV and cleaning, mobilization and demobilization, clearing, grubbing, earthwork, seeding, and erosion control, site grading, miscellaneous appurtenances, safety systems, and all other construction work or materials required for a complete, operating, and acceptable installation. All further requirements regarding bid submittal, qualifications, procedures, and contract award are to be referenced in the Instructions to Bidders included in the Bidding Documents. The Owner reserves the right to reject any or all bids, waive informalities or irregularities, and accept the bid that best serves its interest. Participation by small, minority, and women-owned business enterprises is encouraged. No potential supplier, contractor, or subcontractor will be precluded from consideration on the basis of race, color, religion, sex, age, or national origin. A. These general and detailed specifications form a part of the Contract Documents and shall govern the handling and installation of the equipment, pipe, and appurtenances. B. Furnish all labor, materials, equipment, and incidentals required and construct the improvements in their entirety as shown on the Plans and as specified herein. The Work may include, but is not necessarily limited to, the following: 1. the pipebursting of 2,581 LF of 6" existing clay sewer lines to 8" SDR 17 IPS HDPE 2. the installation of 100 LF of 8" SDR 26 PVC by bore & open cut 3. the installation of 139 LF of 10" SDR 26 PVC by open cut 4. the installation of 90 LF of 20" HDPE encasement by bore 5. the replacement of 3 sanitary sewer concrete manholes 6. the bench repair of 11 concrete sanitary sewer manholes associated with the pipe bursting work 7. pre and post CCTV and cleaning 8. mobilization and demobilization 9. clearing, grubbing, earthwork, seeding, and erosion control 10. site grading 11. miscellaneous appurtenances 12. safety systems 13. items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the lump sum bid item, and the cost thereof shall be considered to be included.

Bid Results

Water / Sewer

$653,333.00

Public - City

Site Work

18

8

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

May 21, 2026

Project location map

Multiple Locations, Mountain View, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.