BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2026 at 8:00 PM

Updated June 9, 2026

Site work and paving for a road / highway in Gun Barrel City, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Phase III of Harbor Point Rd. reconstruction will be from Commodore Rd. North to the GBC City Limits. From Commodore to First Mate: 2355'x24'. From First Mate to City limits: 1470'x22', for a total of 3825'. Bid package shall include: milling up existing pavement to a depth of 8" with removal of 2" to the Street Department; adding Portland cement at a rate of 35 lbs. per square yard and mixing to a depth of 6"; watering and compacting to 95% density; fine grading for proper drainage, allowing proper cure time; tack coat edges with SS-1 tack; overlaying area with TXDOT approved Type "D" asphalt to an average compacted 4" thickness; striping road with double line yellow thermoplastic and white thermoplastic edge lines; contractor responsible for all traffic control. Please direct any questions to Street Superintendent, Mike Howell at 903-887-7504.

Award

Roads / Highways

$529,676.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
461
Active Projects
185
Bidding Soon
4,315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2026

May 28, 2026

Project location map

Harbor Point Rd, Gun Barrel City, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.