Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 1, 2026 at 8:00 PM
Updated April 2, 2026
Site work for a playground / park / athletic field in Dolbeau-Mistassini, Quebec. Conceptual plans call for site work for a playground / park / athletic field.
Reference number: 20134519 Deadline for receipt of complaints 2026-04-13 There is provision for a tendering process for each tender No Expected duration of the contract without options (in months) 6 The Regie intermunicipale du Parc Industrielle (RIPI) of the Maria-Chapdelaine RCM, located in the Saguenay-Lac-Saint-Jean administrative region, is issuing a public call for bids for the provision of professional services to oversee construction work on the infrastructure for the Normandin sector's agri-food park. The infrastructure includes the extension of the water and sewer system and the addition of a "non-overflow" wastewater pumping station. This project is being carried out by the RIPI of the MRC Maria-Chapdelaine. Construction is expected to begin in the spring of 2026 and be completed by October 16, 2026. The method of Contractor Selection has not been Determined at this time. Request for Proposal for Design Services is Underway
Conceptual
Playgrounds / Parks / Athletic Fields
$400,000.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2027
To Be Determined, Dolbeau-Mistassini, QC
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
