BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a municipal facility in Wixom, Michigan. Completed plans call for the renovation of a municipal facility.

As of May 13, 2026, this project has not yet been awarded. The project is expected to be awarded on June 09, 2026. Reference Number 0000418785 uestion Deadline 04/13/2026 at 12:00 PM ET General questions or clarifications regarding this RFP should be directed by email to: Tim Sikma with the subject line clearly stating "RFP Question- Gutter Repair and Replacement" at DPWAdmin@wixomgov.org no later than above date. Responses to email questions posted on MITN April 14, 2026 5 pm Scope:- City Hall & Police Department 49045 Pontiac Trail - Remove and replace all existing EPDM material measuring approximately 825 linear feet on this building. Haul away all removed construction material & debris. The bottom floor surface of the gutter is approximately 12" wide. The front of the gutter upright wall is approximately 8" tall, and the back side upright wall is approximately 10" tall. It is the responsibility of the contractor to confirm alllinear footage & measurements. This can be done at the Mandatory pre-bid walk-through or separate arrangements can be made with Wixom DPW (Mon-Friday 7am-5pm). Photos attached of gutters. The new EPDM shall be white in color and installed with a thickness of 60 mils and fully adhered to all surfaces of the gutter. Contractor shall remove & replace (13) drain assemblies and include new base clamp casting, bolts, & cover. Re-drill & tap to re-secure new drain assemblies as necessary. Replace any deteriorated existing wood substrate as needed and agreed upon by the DPW during the removal process. Please provide a separate line-item cost per 4' x 8' sheet of exterior roofing grade 5/8" CDX plywood to include all materials and labor. Community Center & Library 49015 Pontiac Trail- Remove and replace all existing EPDM material measuring approximately 975 linear feet on this building. Haul away all removed construction material & debris. The bottom floor surface of the gutter is approximately 12" wide. The front side of the gutter upright wall is approximately 8" tall, and the back side upright wall is approximately 10" tall. It is the responsibility of the contractor to confirm all linear footage & measurements. This can be done at the Mandatory pre-bid walkthrough, or separate arrangements can also be made with Wixom DPW (Mon-Friday 7am-5pm). Photos attached of gutters. Bid Results : PD+CH G-1 Services Group $35,100 CC+Lib G-1 Services Group $40,900

Bid Results

Municipal

$76,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
405
Active Projects
202
Bidding Soon
2,180
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.