Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 12, 2026 at 8:00 PM
Updated August 25, 2026
Renovation of a municipal facility in Huntington, Massachusetts. Completed plans call for the renovation of a municipal facility.
Town of Huntington is requesting written responses for exterior rot repair and painting of North Hall located at 40 Searle Road, Huntington, MA. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Town reserves the right to reject any or all responses if it is deemed in the best interest of the Town. For questions regarding this Request for Written Responses, please contact: Jennifer Peloquin - Town Administrator bids@huntingtonma.us Questions must be submitted by Monday, August 17, 2026. Contractor shall perform the following work at North Hall located at 40 Searle Road, Huntington, MA with the following specifications: Remove and dispose of all rotted clapboards, corner trim, fascia board, brickmould, and window sills. Replace all rotted clapboards, corner trim, fascia board, and window sills with new wooden replacements. Replacement clapboards, corner trim, and fascia board should be a minimum of 2 feet in length. All boards must be primed on all sides prior to installation. Caulk all sections where new boards intersect with old boards. Replace all rotted brickmould around windows and doors with new composite brickmould. Caulk around new brickmould, doors, and windows, and any other previously caulked areas to seal out moisture. Scrape loose, peeling, and deteriorating paint from the entire exterior of the building including doors. After scraping, power wash building to remove dust, bugs, mold, etc. Building must be thoroughly dried before applying paint. Prepare all surfaces and apply primer and paint in accordance with manufacturer's recommendations. Prime the entire exterior of the building including doors , trim, gutters , downspouts, and small wooden railing (left side of building) with one coat of primer. Paint the exterior of the building including doors with two coats of white exterior paint. Paint the exterior trim, gutters, downspouts, and small wooden railing (left side of building) that is currently green, the same color green with two coats of exterior paint. Color sample to be verified with Town Administrator prior to application. Primer and paint to be used must be Sherwin Williams or Benjamin Moore. It must be labeled for exterior use. Leftover paint shall be left onsite for Town of Huntington's future use for touch-ups. All non-painted areas shall be protected to avoid potential damage. All damaged and altered areas disturbed by the Contractor's operations shall be restored to pre-existing conditions at no additional cost to the Town. All project debris must be disposed of by the contractor. Normal hours of work will be from 7:00 a.m. to 5:00 p.m. Monday through Friday, excluding legal holidays.
Post-Bid
Municipal
$30,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2026
September 18, 2026
40 Searle Rd, Huntington, MA
Related To This Project
Huntington, MA
Bid Date: Jul 28 2026
Huntington, MA
Bid Date: Aug 06 2026
Huntington, MA
Bid Date: Aug 06 2026
Huntington, MA
Bid Date: Aug 27 2026
Huntington, MA
Bid Date: Aug 27 2026
Huntington, MA
Bid Date: Sep 29 2026
Huntington, MA
Bid Date: Jul 08 2026
Huntington, MA
Bid Date: Mar 10 2026
Huntington, MA
Bid Date: Mar 09 2026
Huntington, MA
--
Huntington, MA
--
Huntington, MA
Bid Date: Dec 10 2025
Huntington, MA
Bid Date: Apr 24 2019
Huntington, MA
Bid Date: Jul 25 2019
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
