BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a civil project in Dorval, Quebec. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Reference number: 20135866 Deadline for receipt of complaints 2026-04-13 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 5 Work is being carried out on Roy Avenue, between 6th Avenue and Dawson Avenue, with the exception of the section on Carson Avenue. Work is also planned on Herron Road, between Oakville Avenue and Elmridge Avenue. This section forms part of the service road for Highway 20 East. The works mainly consist of breaking up and resurfacing the road surfaces, replacing damaged frames, covers, grates, concrete heads and rings, as well as installing adjustable frames. It also includes the replacement of conventional catch basins with kerb-level catch basins, the repair of kerbs and pavements, as well as the management and disposal of materials generated. In addition, sewer works will be carried out according to the needs identified in the targeted areas Work may commence on 22 June. The maximum duration of the works is 70 working days. They must be completed, including the rectification of any defects, by 16 October at the latest. The City Engineer must be notified at least five days before work begins. Work must not be carried out simultaneously on several streets. One street must be fully completed, including the rear section, before moving on to the next. Once started, work on a street must not exceed 35 working days. Roy Avenue is being carried out in sections. The works are taking place one section at a time, including the rear repairs, either between 6th Avenue and Carson Avenue, or between Carson Avenue and Dawson Avenue, depending on the sequence of the works. As for the second phase of the project, this work must be carried out over a maximum period of 20 working days, independently of the other works scheduled under the contract. It may begin from 22 June and must be completed by 21 August at the latest.

Bid Results

Roads / Highways

$3,720,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
717
Active Projects
482
Bidding Soon
4,097
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2026

June 22, 2026

Project location map

Multiple Locations, Dorval, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.