BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2026 at 8:00 PM

Updated June 10, 2026

Site work for a water / sewer project in New London, Connecticut. Completed plans call for site work for a water / sewer project.

The project consists of purchasing mobile shore power equipment and furnishing and installing supporting shore power infrastructure at the New London State Pier. This will enable docked marine vessels to connect to the local electric grid to power onboard services instead of running their diesel engines. The system is intended to reduce diesel emissions by providing power to vessels at berth, decrease health risks, and lessen noise pollution for port workers and near-port communities. The work includes furnishing and installing an additional power vault at the East Berth and procuring and installing a Mobile Cable Management System (CMS) that can connect to the power vault, or to one of the two existing vaults, and supply cabling to docked vessels. The additional power vault at the East Berth will allow the mobile unit to serve a wider variety of vessel types and sizes. Orsted Wind Power Environmental LLC will provide support to the Authority regarding procurement of the Long Lead Equipment, including development of scope of work, selection support for the successful Proposer, and serving as the Authoritys representative regarding Long Lead Equipment by providing coordination and oversight of suppliers. Deadline for Questions: Thursday, April 2nd, 2026: 4:00 PM EDT Official Authority Contact: The Authority's contact person for the purpose of this RFP is: Jill Dowling-Moreno Office Manager Connecticut Port Authority 455 Boston Post Road, Suite 204 Old Saybrook, CT 06475 860-577-5174 info@ctportauthority.com

Award

Water / Sewer

$1,724,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
778
Active Projects
50
Bidding Soon
4,774
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2026

June 23, 2026

Project location map

To be determined, New London, CT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.