BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 19, 2026

Renovation of an educational facility in Perth, Ontario. Completed plans call for the renovation of a educational facility.

* No bid amount to be released for publication. The Catholic District School Board of Eastern Ontario invites qualified contractors to submit quotations for the Gymnasium RTU Replacement Project and associated work at St. John Elementary Catholic, 34 Wilson Street East, Perth, Ontario. The work includes the removal of the existing Carrier Rooftop Unit (RTU), which is currently failing, and the supply and installation of a new like-for-like Carrier RTU. In addition, the work includes the supply and installation of a new Exhaust Fan and a Ductless Split System with outdoor rooftop condenser. The new system shall provide both heating and cooling to the classrooms and be tied to the school's existing BACNET system. The contractor shall include all required demolition of existing infrastructure and provision of new infrastructure for the work at hand for all disciplines as outlined in the mechanical, electrical, structural and architectural discipline design drawings. Attendance at the mandatory site meeting by contractors is required for bid eligibility. Sub-contractors are not required to attend, and their attendance will not count toward bidder compliance. Question Deadline 04/28/2026 at 12:00 PM ET Questions and clarifications will only be received and answered via online. Documents can be obtained from https://www.biddingo.com/ Site Meeting Site Meeting Date 04/15/2026 01:45:00 PM ET (MM/DD/YYYY) Mandatory Meeting Location: 34 Wilson Street, East , Perth, Ontario K7H 1L6 Canada Details: The work includes the removal of the existing Carrier Rooftop Unit (RTU), which is currently failing, and the supply and installation of a new like-for-like Carrier RTU. In addition, the work includes the supply and installation of a new Exhaust Fan and a Ductless Split System with outdoor rooftop condenser. The new system shall provide both heating and cooling to the classrooms and be tied to the schools existing BACNET system. The contractor shall include all required demolition of existing infrastructure and provision of new infrastructure for the work at hand for all disciplines as outlined in the mechanical, electrical, structural and architectural discipline design drawings. The existing wing of the school within the main scope of work area is a flat roof section where the replacement unit is currently located at. This area of rooftop is expected to also house the new exhaust fan and condensing unit. This project is subject to funding.

Award

Educational

$200,000.00

Public - State/Provincial

Renovation

7

5

4

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 29, 2026

Project location map

34 Wilson St E, Perth, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.