Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 16, 2026
Site work and renovation of a mixed-use development in Poplar Bluff, Missouri. Completed plans call for the renovation of a fire / police facility; and for site work for a water / sewer project.
The project includes, but is not limited to, renovation of all the existing restrooms throughout the Troop E Headquarters Building. The design shall include facility upgrades, quantity of fixtures, as well as compliance with accessibility for drinking fountains and both men and women restrooms. The scope of work shall include the infill of a water fountain recess to a closet. In addition, the scope shall include the replacement of select cast iron piping, at minimum sleeving of main lines. Design includes a potential add of a booster pump for overall efficiency. Ceilings will be modified as required for new design. MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. Document Acquisition Note: Refunds: Return plans and specifications in unmarked condition within 15 working days of bid opening to American Document Solutions, 1400 Forum Blvd., Suite 7A, Columbia, Missouri 65203. Phone 573-446-7768, Fax 573-355-5433. Deposits for plans not returned within 15 working days shall be forfeited. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. Question Deadline 04/23/2026 Bidders shall make all requests for interpretations in writing and submit all requests to the Project Designer and Project Manager
Bid Results
Fire / Police
$307,400.00
Public - State/Provincial
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2026
June 29, 2026
4947 US-67, Poplar Bluff, MO
Related To This Project
Poplar Bluff, MO
Bid Date: May 15 2026
Poplar Bluff, MO
Bid Date: May 15 2026
Poplar Bluff, MO
Bid Date: May 22 2026
Poplar Bluff, MO
Bid Date: May 07 2026
Poplar Bluff, MO
Bid Date: May 20 2026
Poplar Bluff, MO
Bid Date: Apr 28 2026
Poplar Bluff, MO
Bid Date: Mar 04 2026
Poplar Bluff, MO
Bid Date: Apr 08 2026
Poplar Bluff, MO
--
Poplar Bluff, MO
Bid Date: Mar 11 2026
Poplar Bluff, MO
--
Poplar Bluff, MO
Bid Date: Mar 18 2026
Poplar Bluff, MO
Bid Date: Dec 10 2025
Poplar Bluff, MO
Bid Date: Oct 28 2025
Poplar Bluff, MO
Bid Date: Nov 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
