BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Site work and renovation of a mixed-use development in Poplar Bluff, Missouri. Completed plans call for the renovation of a fire / police facility; and for site work for a water / sewer project.

The project includes, but is not limited to, renovation of all the existing restrooms throughout the Troop E Headquarters Building. The design shall include facility upgrades, quantity of fixtures, as well as compliance with accessibility for drinking fountains and both men and women restrooms. The scope of work shall include the infill of a water fountain recess to a closet. In addition, the scope shall include the replacement of select cast iron piping, at minimum sleeving of main lines. Design includes a potential add of a booster pump for overall efficiency. Ceilings will be modified as required for new design. MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. Document Acquisition Note: Refunds: Return plans and specifications in unmarked condition within 15 working days of bid opening to American Document Solutions, 1400 Forum Blvd., Suite 7A, Columbia, Missouri 65203. Phone 573-446-7768, Fax 573-355-5433. Deposits for plans not returned within 15 working days shall be forfeited. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. Question Deadline 04/23/2026 Bidders shall make all requests for interpretations in writing and submit all requests to the Project Designer and Project Manager

Bid Results

Fire / Police

$307,400.00

Public - State/Provincial

Renovation, Site Work

37

21

13

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
39
Bidding Soon
313
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 29, 2026

Project location map

4947 US-67, Poplar Bluff, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.