BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 15, 2026

Demolition, site work and new construction of a bridge / tunnel in Newsome, Idaho. Completed plans call for the demolition of a bridge / tunnel.

The contractor is to remove the existing steel girder bridge with concrete foundations and replace it with a single span pre-stressed concrete girder bridge with reinforced concrete abutments on piles. The road will be closed during construction and traffic will be detoured. Additional work includes roadway approach construction and permitted stream alterations including placing riprap. Question Deadline 04/20/2026 at 5:00 PM PT All questions and contact during the bidding period must be submitted through Online. technical questions or clarification requests will be accepted.

Award

Bridges / Tunnels

$2,318,780.00

Public - County

Demolition, New Construction, Site Work

118

9

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
7
Bidding Soon
158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

June 15, 2026

Project location map

Clear Creek Road, Newsome, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.