BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 19, 2026

Site work and paving for a sidewalk / parking lot in West Bend, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of May 18, 2026 project was awarded to Miller Excavating Inc, awarded amount is $251,234.80. Major quantities for the work include: Salvage and install 3 hydrants; 425 cubic yards of common excavation; 540 tons of aggregate base, Class 5; 72 tons of bituminous paving; 0.17 acres of seeding; 3,514 square feet of concrete walks and driveways; 900 square feet of concrete block landscape wall; 3 hydrant assemblies; 2 flared end sections, 15-inch with trash guard; 8 cubic yards of random riprap; and 137 linear feet of wire fence. Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the instructions to bidders. Contractors must submit a signed statement under oath verifying compliance with the minimum criteria in Minnesota Statutes, Section 16C.285, Subdivision 3. Minimum wage rates must be paid as predetermined and are subject to the Work Hours Act of 1962 and implementing regulations. Bidders must comply with Title VI of the Civil Rights Act of 1964, equal employment opportunity regulations, and the Minnesota Human Rights Act, including obtaining and maintaining valid Certificates of Compliance as required. Affirmative action requirements must be met. This project has a Disadvantaged Business Enterprises (DBE) goal. The City reserves the right to reject any and all Bids, to waive irregularities and informalities, and to award the Contract in the best interests of the City. Salvage and Install Hydrants Each 3 Common Excavation CY 425 Aggregate Base, Class 5 Ton 540 Bituminouse Paving Ton 72 Seeding Acre 0.17 Concrete Walks and Driveways SF 3,514 Concrete Block Landscape Wall SF 900 Hydrant Assembly Each 3 Flared End Section, 15-inch with Trash Guard Each 2 Random Riprap CY 8 Wire Fence LF 137 Question Deadline 04/10/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than 10 days prior to the date for opening of Bids may not be answered.

Award

Sidewalks / Parking Lot

$251,235.00

Public - City

Paving, Site Work

40

14

7

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
175
Bidding Soon
1,754
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2026

June 4, 2026

Project location map

S 5th Ave, West Bend, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.