Published May 8, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a civil project in Moses Lake, Washington. Completed plans call for site work for a water / sewer project; and bridge / tunnel.

This project consists of replacing approximately 232 lineal feet of 12" steel water main with 96 lineal feet of 12" ductile iron (DI) water main and 136 lineal feet of Thermacor Ferro-Therm 12" pre-insulated DI water main. The contractor will connect the new water main at existing connection locations on each side of the Alder Street Bridge. The portion of the water main under the bridge will be installed in existing brackets and holes in concrete supports. Removal of the existing pipe requires additional care due to the presence of asbestos in the pipe coating associated with the insulation under the bridge. The contractor must prepare pavement on either side of the bridge with saw cutting of asphalt, curb and gutter, in addition to removal and restoration of sidewalk panels, curb and gutter, guardrails, and final restoration of 34 square yards of HMA patching associated with the trenching area. Fencing below the bridge will need to be removed for pipe installation and restored after all work below the bridge is complete. Estimated Project Cost: $140,000- $175,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$193,032.00

Public - City

Site Work

7

5

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
43
Bidding Soon
317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 1, 2026

Project location map

S Alder St, Moses Lake, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.