Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 20, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a pipeline in Grand Rapids, Michigan. Completed plans call for site work for a pipeline.
Installation of Duct Bank on STOCKING AVENUE from 1st Street to 4th Street. Furnish all parts, labor, materials, supplies, equipment, and other facilities and things necessary and proper for and incidental to the proper performance and completion of the work specified in the Contract Documents, including the drawings and specifications, and as required by the City Manager and City Engineer. Begin construction within seven (7) calendar days after a Contract is executed (unless otherwise indicated in the Special Provisions) and complete the work by the listed dates. Addenda, if any, are to be acknowledged on the form provided at the place where bids are received, and a signed copy attached to the bid. Substantial Completion Date: 30 calendar days from the start of construction, but no later than August 28, 2026 Question Deadline 04/07/2026 All questions about the meaning or intent of the Bidding Documents shall be submitted to the Engineer in writing Questions received less than 5 business days prior to the date for opening of Bids will not be answered. Final Completion Date: September 11, 2026 This work consists of the construction of a new duct bank alongside an existing duct bank, replacement of one manhole, and replacement of the riser at 4th Street Northwest and Stocking Avenue Northwest, including all removals and restoration to complete the work. The City's Mission Statement and Sustainability Vision Statement, defines the purpose of the Equal Business Opportunity (EBO) - Construction Policy and Administrative Guidelines (1) provide equitable access to do business with the City; (2) encourage involvement in the City's Sustainability Vision Statement themes; and (3) enhance the growth, development and participation of small and emerging businesses to perform on City construction contracts. The EBO - Construction Policy and Administrative Guidelines include bid discount provisions. The Administrative Guidelines for the EBO - Construction Policy describes the City's bid incentive provisions. Bidders and subcontractors must comply with the City of Grand Rapids prequalification and license requirements. Contractors and subcontractors on the project may not discriminate against any employee or job applicant in any matter related to employment because of actual or perceived color, race, religion or creed, sex, gender identity or expression, sexual orientation, national origin, genotype, age, marital status, familial status, medical condition, disability, height, weight, or source of lawful income and the successful bidder will be required to insert that provision in all subcontracts relating to the project. The successful bidder will be required to have a policy regarding Drug Free Workplace and certify to the City that this policy is in place. A certified cashier's check or bid bond for a sum not less than five percent (5%) of the amount of the Bid will be required with each bid. No bid may be withdrawn for a period of 45 calendar days after the date and time for receiving bids. The City reserves the right to accept or reject any and all Bids; to reject the Bid of a Bidder who is not, in the opinion of the Engineer or City, in a position to perform the contract; to waive informalities, irregularities and technicalities; to reject any and all non-conforming, non-responsive, unbalanced [unreasonable unit price(s)] and/or conditional Bids; or to advertise for new Bids at its discretion. The City also reserves the right to award the Contract in the City's best interest, and therefore, may select a Bidder other than the lowest.
Bid Results
Pipeline
$392,292.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2026
May 14, 2026
Stocking Ave NW, Grand Rapids, MI
Related To This Project
Grand Rapids, MI
Bid Date: Apr 30 2026
Grand Rapids, MI
Bid Date: Apr 28 2026
Grand Rapids, MI
Bid Date: Apr 29 2026
Grand Rapids, MI
--
Grand Rapids, MI
Bid Date: Apr 22 2026
Grand Rapids, MI
Bid Date: Apr 21 2026
Grand Rapids, MI
Bid Date: Apr 23 2026
Grand Rapids, MI
Bid Date: Apr 22 2026
Grand Rapids, MI
Bid Date: Apr 09 2026
Grand Rapids, MI
--
Grand Rapids, MI
--
Grand Rapids, MI
Bid Date: May 05 2026
Grand Rapids, MI
Bid Date: May 28 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
