BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a mixed-use development in Parkland County, Alberta. Completed plans call for site work for a sidewalk / parking lot; and road / highway.

a) 52nd Avenue: 1 Conduct a pre-overlay inspection with ISL and the Town of Calmar representative to identify locations requiring asphalt repairs, including potholes and crack rehabilitation. 2 Contractor to complete asphalt repairs, including pothole repairs consisting of full-depth removal and replacement with granular material having a maximum particle size of 50-75 mm, placed to match the existing pavement structure. The existing granular pavement structure is expected to be between 300 mm and 450 mm in depth. Granular material shall be compacted and placed on tri-axial geogrid material and a non-woven geotextile separator. 3 Remove and replace existing monolithic concrete sidewalk and rolled face curb and gutter on the north side of the avenue as shown on drawings. 4 Remove and replace existing rolled face concrete curb and gutter on the south side of the avenue as shown on drawings. 5 Sawcut and remove a 0.5 m wide strip of asphalt adjacent to the existing lip of gutter to provide working space for curb construction and to create a smooth transition with the proposed asphalt overlay. Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction. 6 From the edge of the sawcut described in Clause .5, mill a 0.5 m wide strip at a depth of 50 mm (minimum) into the existing asphalt roadway to provide tie-in to the existing asphalt and achieve a minimum 50 mm asphalt overlay thickness. 7 Place asphalt prefill from the lip of gutter to a width of 1.0 m, filling all areas described in Clauses .5 and .6 to match the elevation of the existing asphalt. 8 Place a minimum 50 mm asphalt overlay throughout the roadway, extending from the constructed lip of gutter on either side of the road, filling all voids, milled areas, and prefill locations. 9 Landscape restoration adjacent to concrete works. 10 Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction. b) 52nd Street: 1 Conduct a pre-overlay inspection with ISL and the Town of Calmar representative to identify locations requiring asphalt repairs, including potholes and crack rehabilitation. 2 Contractor to complete asphalt repairs, including pothole repairs consisting of full-depth removal and replacement with granular material having a maximum particle size of 50-75 mm, placed to match the existing pavement structure. The existing granular pavement structure is expected to be between 300 mm and 450 mm in depth. Granular material shall be compacted and placed on tri-axial geogrid material and a non-woven geotextile separator. 3 Remove and replace monolithic existing concrete walk, rolled face curb & gutter on the east side of the street. 4 Sawcut and removal of the west existing concrete walk, rolled face curb & gutter and replace with rolled face concrete curb and gutter. 5 Sawcut and remove a 0.5 m wide strip of asphalt adjacent to the existing lip of gutter to provide working space for curb construction and to create a smooth transition with the proposed asphalt overlay. Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction. 6 From the edge of the sawcut described in Clause .5, mill a 0.5 m wide strip at a depth of 50 mm (minimum) into the existing asphalt roadway to provide tie-in to the existing asphalt and achieve a minimum 50 mm asphalt overlay thickness. 7 Place asphalt prefill from the lip of gutter to a width of 1.0 m, filling all areas described in Clauses .5 and .6 to match the elevation of the existing asphalt. 8 Place a minimum 50 mm asphalt overlay throughout the roadway, extending from the constructed lip of gutter on either side of the road, filling all voids, milled areas, and prefill locations. 9 Landscape restoration adjacent to concrete works. 10 Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction. Question Deadline 04/15/2026 at 8:33 PM MT

Post-Bid

Roads / Highways

$500,000.00

Public - City

Site Work

14

21

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
61
Bidding Soon
642
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2026

June 1, 2026

Project location map

Multiple Locations, Parkland County, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.