Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 8, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a transportation facility in Burlington, North Carolina. Completed plans call for site work for a transportation facility.
AVGAS Fuel System Replacement Package 1 (Site Preparation and Concrete) WBS NO. 36244.16.20.2 Furnish all labor, materials, and equipment and perform all work required to satisfactorily complete the Site Preparation and Concrete associated with the overall AVGAS Fuel System Replacement project. Items of work include erosion control, fence and bollard demolition, site grading, and construction of concrete slab and tank supports. Carefully read the instructions for preparing bids in Section 20 of the specifications before submitting bids. Each bid must be submitted in a sealed envelope and clearly marked with the project name. Pre-qualification requirements: Each bidder must be registered as a prequalified bidder with the NCDOT at the time of bid opening. All subcontractors must be registered as a pre-qualified subcontractor with the NCDOT at the beginning of the project. Each bid must be accompanied by a Bid Bond, a deposit of cash, or a certified check payable to Burlington-Alamance Airport Authority for an amount equal to 5% of the total base bid. The required Contract and Performance and Payment Bonds must be furnished within fifteen days after receipt of written notice of the award. The contract is subject to Federal Contract Provision Requirements contained in Appendix 'C' of the Contract Documents. All contracts and subcontracts that result from this solicitation incorporate by reference the provisions of the Federal Fair Labor Standards Act (FLSA). The Burlington-Alamance Airport Authority reserves the right to reject any or all proposals. The award is contingent upon the availability of Federal, State, and Local funds. No discrimination will be allowed in consideration for an award based on race, color, national origin, sex, creed, age, or disability in accordance with Title VI of the Civil Rights Act of 1964 and related regulations. Question Deadline 04/30/2026 A Bidder who discovers discrepancies or omissions with the project bid documents shall immediately notify the Owner's ENGINEER of the matter. A bidder that has doubt as to the true meaning of a project requirement may submit to the Owner's ENGINEER a written request for interpretation no later than 5 days prior to bid opening.
GC Bidding
Transportation Terminals
$600,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
