BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a transportation facility in Orlando, Florida. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Originally placed into service in 1989, Taxiways E and F function as vital cross-field parallel taxiways centrally located within the airfield, providing a primary connection between the East and West Airfields at Orlando International Airport. The project includes comprehensive rehabilitation to restore pavement performance, improve infrastructure, and ensure continued compliance with current Federal Aviation Administration (FAA) design and safety standards. Construction activities will include milling and overlaying the existing asphalt pavement, removal and replacement of designated concrete slabs, and rehabilitation of the taxiway shoulders. The project also incorporates installation of new electrical ductbank infrastructure to support airfield lighting and navigational aids, as well as drainage improvements to enhance stormwater conveyance and maintain compliance with FAA and airport requirements. Additional upgrades will address taxiway geometry, safety areas, pavement markings, lighting, and signage to fully align with the FAA's current standards and ensure safe, efficient, and reliable aircraft operations well into the future. Question Deadline 04/21/2026 at 5:00 PM ET Any communication during the solicitation process must be submitted to the Aviation Authority via electronically. In the event of the digital Q&A is not functional, please contact the Procurement Point of Contact specified Kerry Gray-Brown, Sr. Procurement Agent, Capital Programs, kerry.gray-brown@goaa.org. Tentative Aviation Board Approval Date: October 21, 2026 Tentative Notice to Proceed Date: November 2, 2026 Tentative Substantial Completion Date: September 13, 2027 Tentative Final Completion Date: November 12, 2027

Post-Bid

Transportation Terminals

$8,000,000.00

Public - City

Paving, Site Work

187

35

71

8

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
140
Bidding Soon
1,940
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

November 2, 2026

Project location map

1 Jeff Fuqua Blvd, Orlando, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.