BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2026 at 8:00 PM

Updated May 19, 2026

Site work for an educational facility in San Luis Obispo, California. Completed plans call for site work for a educational facility.

The San Luis Obispo County Community College District (SLOCCCD) is requesting bids for Fiber-Optic Upgrades at Cuesta College's San Luis Obispo Campus . License Requirements A, B, and C-10 Liquidated Damages $2,000/day (substantial completion)/$1,000/day (late submittal and punchlist) Start/Delivery Date June 29, 2026 Project Duration 60 days Bid(10%), Performance(100%), Payment(100%) Contractor shall provide and install all telecommunications pathway, conduit, pull boxes, innerduct, cabling, terminations, grounding, and associated infrastructure required to establish a new fiber optic backbone between the existing COE Maintenance Building MDF and the new IDF in Building 4800, including directional boring, new 4" underground conduit, installation and splicing of single mode fiber, IDF cabinet build out, Cat6A cabling for wireless access points, and all labeling and testing as shown on Sheets T 001 through T 303. Work includes wiring and mounting of Owner furnished wireless access points and the Barn network cabinet per drawings, as well as required branch circuit power for telecom equipment. All work shall comply with project notes, details, and applicable codes. Online Q&A Yes Q&A Deadline 04/22/2026 2:00 PM (PDT)Submit Pre-Bid Inquiries to: blakem@klassencorp.com Phone: (661) 304-5059 COPE OVERVIEW – Contractor shall provide and install all telecommunications pathway, conduit, pull boxes, innerduct, cabling, terminations, grounding, and associated infrastructure required to establish a new fiber-optic backbone between the existing COE Maintenance Building MDF and the new IDF in Building 4800, including directional boring, new 4" underground conduit, installation and splicing of single-mode fiber, IDF cabinet build-out, Cat6A cabling for wireless access points, and all labeling and testing as shown on Sheets T-001 through T-303. Work includes wiring and mounting of Owner-furnished wireless access points and the Barn network cabinet per drawings, as well as required branch-circuit power for telecom equipment. All work shall comply with project notes, details, and applicable codes

Sub-Bidding

Educational

$1,000,000.00

Public - County

Site Work

10

9

11

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
20
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

July 28, 2026

Project location map

CA-1, San Luis Obispo, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.