BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 20, 2026

Site work and renovation of a military facility in Schenectady, New York. Completed plans call for the renovation of a military facility.

Provide all construction services and materials to repair the main sewer line and renovate associated facilities in Building 2A at Stratton Air National Guard Base in Scotia, New York. The work includes replacement of approximately 142 linear feet of sewer pipe, replacement of 27 plumbing fixtures, asbestos abatement in the women's locker room, and renovation of the affected restrooms, showers, and lounge areas. Option 1 includes repair and retiling of an approximately 2,784 square foot corridor. Option 2 includes renovation of the 1,200 square foot male locker room, including asbestos abatement. Pricing must be provided for all line-items and be valid for 90 days after quote submission. Construction wage rates for Schenectady County, New York apply. Performance and payment bonds are mandatory and must be furnished within 10 calendar days after award. Questions must be submitted in writing via email to: 109.AW.FAL.MSC.Contracting@us.af.mil; it was reiterated that contractors should submit questions in writing ASAP and that the only official source for answers to questions is via written response from the contracting office posted to SAM.gov. The 109 Contracting Office can be reached by phone at 518-344-2513; note that technical questions must be submitted in writing and will not be answered over the phone. The building's sewer line exhibits bowing and cracking causing monthly clogs and seepage into the soil . Approximately 76 LF of 4" sewer line , 16 LF of lateral lines , 27 fixtures (toilets , urinals , sinks , showers ) need to be replaced within the building and approximately 50 LF of 8" clay line to be replaced outside the building up to the manhole per Uniform Plumbing Code . The existing sewer line runs both within the building and across the road , connecting to the manhole . The bathrooms and the office affected by the sewer line repair need repair and upgrading . Female bathroom and restroom area is approximately 807 SF, male bathroom and restroom area is approximately 650 SF, male locker room is approximately 1,200 SF (OPTION 2), the lounge area (including smaller rooms ) is approximately 1,500 SF. The corridor (OPITON 1) is approximately 2,784 SF. Contractor to verify dimensions and shapes . Site visit is strongly encouraged . The work shall begin in October /November 2026. The building will stay operational during the construction .

Post-Bid

Military

$1,000,000.00

Public - Federal

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
218
Bidding Soon
2,406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2026

October 1, 2026

Project location map

Multiple Locations, Schenectady, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.