BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2026 at 8:00 PM

Updated July 16, 2026

Renovation of a water / sewer project in Chula Vista, California. Working plans call for the renovation of a water / sewer project.

The Project Generally Consists Of Removing And Replacing Approximately The Bottom Third Of The Concrete Stairway, From The Top Of The Dam To The Valve House Located On The Downstream Face Of The Dam. Work On The Project Shall Be Completed Within Ninety (90) Working Days. Online Q&A Yes Q&A Deadline 05/18/2026 12:00 PM (PDT) Bid Bond 10.00% Project Duration Ninety (90) working days a. Item 1: Mobilization i. Mobilization of equipment, personnel, supplies and incidentals to the site. ii. Demobilization. iii. Project site and equipment setup. iv. Project licenses and permits. v. All other charges not otherwise itemized. b. Item 2: Temporary Facilities and Controls i. Field offices, buildings, equipment, and supplies. ii. Temporary utilities. iii. Control of water, erosion, noise, dust, rodents, and other nuisances. iv. Sanitary facilities. v. Vehicle access. vi. Fire prevention. vii. Security. viii.Contractor's staging area. ix. Management personnel at the start and end of the Work. c. Item 3: Demolition, Removal, & Patching i. Demolition, removal, and patching of handrails. ii. Demolition, removal, and patching of electrical conduit and lighting fixtures. iii. Demolition, removal, and patching of water pipes. iv. All other demolition, removal, and patching. d. Item 4: Stainless Steel Brackets & Concrete Anchor Bolts i. Locate embedded items and relocation of anchor bolts to clear conflicts. ii. Bracket fabrication and procurement. ("Brackets" are stainless steel plates that sit against face of dam, with protruding welded plates for connection of stainless steel framing.) iii. Bracket delivery. iv. Concrete anchor bolt procurement. v. Concrete anchor bolt installation. vi. Dam surface preparation. vii. Bracket installation. e. Item 5: Stainless Steel Framing i. Framing fabrication and procurement. ("Framing" consists of stainless steel members and connections that attach to "brackets" and support stairs and platforms.) ii. Framing delivery. iii. Framing installation. f. Item 6: Manufactured Stainless Steel Stairs & Platforms i. Stair & platform fabrication and procurement. (Stairs and platforms include all structural members, railings, grating, stair treads and nosings, and connections.) ii. Stair & platform delivery. iii. Stair & platform installation. g. Item 7: Replacement Electrical Conduit & Lighting i. Design of electrical conduit & lighting. ii. Furnishing of materials for electrical conduit & lighting. iii. Installation and testing of electrical conduit & lighting. h. Item 8: Replacement Water Line i. Design of water line. ii. Furnishing of materials for water line. iii. Installation and testing of water line.

Final Planning

Water / Sewer

$639,000.00

Public - City

Renovation

28

18

4

6

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
62
Bidding Soon
969
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2026

July 27, 2026

Project location map

505 Garrett Avenue, Chula Vista, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.