BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 20, 2026

This is a service / maintenance or supply contract in Denver, Colorado. Contact the soliciting agency for additional information.

Reference Number 0000419471 Question Deadline 04/20/2026 at 4:00 PM MT Questions are submitted online No Questions and requests for clarification regarding this project shall be submitted before the deadline listed in the above Schedule. Communication regarding the project during the procurement, outside of this submission process or scheduled procurement milestones is not permitted. The Auraria Higher Education Center (AHEC) seeks to develop a comprehensive and detailed Campus Electrical Distribution System Comprehensive Plan that will serve as a strategic framework for guiding electrical and other energy infrastructure investments, system modernization, sustainability goals, and long-term operational resilience. This plan will evaluate existing electrical distribution and energy systems and outline actionable pathways for increasing the electrical capacity to serve the developmental growth of the tri-institutional campus. The Auraria Campus houses 44 buildings built as long ago as 1873 and as recent as 2021. The campus electrical system is a medium-voltage distribution system owned and operated by AHEC facilities. Xcel Energy provides power to the campus with two (2) redundant 16.92 MW feeders that feed a 1200A Automatic Throw-Over Switchgear. Power to almost all buildings on campus is provided by this system. The campus is growing, with 4 new all-electric buildings being built in the next 1-3 years. This growth, along with a commitment to move all remaining campus buildings onto the AHEC distribution system (off Xcel's secondary general service), is pushing the distribution system to the limit of its capacity. This study is being undertaken to be prepared for future campus growth. The goal of this plan is to build off a 2025 engineer study detailing the current campus electrical distribution system's capacity to determine the existing system's capacity and address future energy demands through 2035. This plan aims to address current capacity constraints, optimize energy distribution, and implement innovative solutions to support the campus' growth and operational efficiency. General Requirements - Insurance Required The method of Contractor Selection has not been Determined at this time. Request for Proposal for Design Services is Underway

Conceptual

Educational

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
142
Bidding Soon
1,799
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2026

Project location map

Multiple Locations, Denver, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.