Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2026 at 8:00 PM

Updated May 28, 2026

Site work for a water / sewer project in Dorval, Quebec. Completed plans call for site work for a water / sewer project.

Reference number: 20136331 Deadline for receipt of complaints 2026-04-17 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 3 The works involve the inspection and repair of service connection valves and service taps, the cleaning of 150 mm, 200 mm and 250 mm drinking water pipes using the bore-and-line method, the replacement of valves, the replacement of fire hydrants and the installation of sacrificial anodes on Carson Avenue (between Caledonia and Thorncrest Avenues), Oakville Avenue (between Carson and Denton Avenues), Parkwood Roundabout and Neptune Boulevard (between Campbell and Lark Avenues). The fire hydrant connection pipes (150 mm), including isolation valves, are not included in the contract (with the exception of fire hydrants requiring replacement). Bids will be opened on 24 April 2026 at 11:00 am. Delivery schedule A work schedule must be submitted to the Engineer for approval prior to the commencement of works. The scheduled start date for works is 21 May 2026. The works must be completed within 50 working days. The Engineer must be notified at least 5 days prior to the commencement of works

Award

Water / Sewer

$1,449,069.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
572
Active Projects
287
Bidding Soon
2,552
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2026

May 21, 2026

Project location map

Multiple Locations, Dorval, QC


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed