BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a municipal facility in Hollywood, Florida. Completed plans call for site work for a municipal facility.

The Housing Department of the Seminole Tribe of Florida is requesting bids from qualified contractors to provide fence installation services needed at the Hollywood Reservation. Question Acceptance Deadline 04/17/2026 05:00 PM EDT Questions are submitted online Yes. Questions submitted through BidNet Direct, Contact Martha Gongora Diaz Email: To: MarthaGongoraDiaz@semtribe.com Cc: BidSubmissions@semtribe.com Phone: O: (954) 966-6300 x 10988 C: (954) 248-0012 The TRIBE reserves the right to reject any or all bids, to waive formalities or informalities, and to award either in whole or in part GENERAL: o Schedules should be submitted with all bids and updated any time there is a change o Contractors are expected to work Monday-Friday, 8:00AM - 5:00PM unless otherwise specified by the TRIBE's Project Manager o No work shall be performed on Tribal events, holidays, and advisory emergencies, unless otherwise determined by the TRIBE. o When installing new drywall in bedroom, living room, etc., backing must be provided for TVs being mounted on the wall o Place a chase and an outlet at the same area where backing is located o Seal all recess lighting, caulk the lights to the ceiling o Caulk around all exterior lights o All exterior light fixtures must be LED o Any penetration that are made through the wall to the exterior must be caulked orsealed o Any new gutters must have leaf guard o Any roof repairs/replacement must follow Miami-Dade standards BATHROOM: o All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood o Due-rock on walls in the shower or tub area o All joints, corners, and around windows must be sealed with red guard o Extend the Dur-rock 2' on all sides beyond the shower or tub o Shower floor mortar bed, no foam or any other products should be used o Minimum 2-4% pre-slope o Liner should be water tested for 24 hours o Minimum 6 inches o All floor tile should be slip/skid resistant o Shower floor tile should be a maximum of 2x2 mesh o Provide backing for all walls inside tub/shower areas between 32" and 38" o Faucets should be Kohler or Delta o From shower diverter to shower head piping must be copper tubing and copper fittings o Secure the diverter and pipe fittings securely o When tiling the walls extend 2 feet passed the shower or tub o ADA bathroom the entire bathroom must be tile a minimum of 4 feet o All toilets must be Kohler highline o All exhaust must be vented through the roof or soffit o The exhaust fan and light for the bathroom must be on the same switch o All paint must be high gloss 2.3. KITCHEN: o All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood o All sinks should be deep double drop in sinks o Faucets should be Delta with a pull out spray hose o Moisture resistant (purple) drywall o Cabinet screws should be a minimum of 2 1/2 inches o Efforts should be made to find a stud o If drywall is removed from floor to ceiling, blocking must be provided for upper and lower cabinets o All microwave and kitchen hoods must be exhausted outside 2.4. MECHANICAL/HVAC: o All AC units must be installed on a metal stand with a secondary pan and connect float switch o A primary float switch must be installed and connected o When replacing duct work all joints and seams must be taped and mastic o All new HVAC units must be a minimum of 16 seer o All flexible ducts mut be a minimum of R8 R-value o All disconnects should be the pull type non-fuse o Rheem, Goodman, Night and Day units preferred o Caulk around all AC vents o Keyed lockout caps must be on all units 2.5. WATER HEATERS: o GE brand, replaced like for like gallon size o Drain pan required o TRV piped to the outside o All water heaters should have a separate shut off switch o New code required Energy conservation code chapter 4 o Heat traps are mandatory FENCE INSTALLATION: o CONTRACTOR shall demolish and responsibly dispose of existing fencing along: o Westernmost fenceline. o Northernmost fenceline. o CONTRACTOR shall supply and install six-foot (6') tall fencing as described below: o Dimensions: Six-foot (6') tall Gate returns shall be five-foot (5') tall and six-foot (6') wide o Material: 9-Gauge Green Vinyl Coated Galvanized Chain-link o Color: Green o CONTRACTOR shall install quantity of two (2) five-foot (5') tall and six-foot (6') wide pedestrian walk gate returns o Location is indicated on Attachment E - Survey Site Plans, which will be provided to prospective respondents at the Pre-Bid Conference. o CONTRACTOR shall install the following: o 9-Gauge Green tension wire across the bottom of all fencing. o Fence line, gate, corner, and terminal posts The posts shall be encased in two feet (2') deep concrete and twentyfour inches (24") below existing grade. o CONTRACTOR shall schedule locates with all utilities prior to digging for project address. o CONTRACTOR shall provide and install all associated hardware for complete gate assemblies and operation per industry standards. o CONTRACTOR shall clean up jobsite daily. The services described in this solicitation shall be completed at the locations identified below: 6521 James E. Billie Drive Hollywood, Florida 33024

Post-Bid

Municipal

$200,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
122
Bidding Soon
2,094
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2026

May 25, 2026

Project location map

6521 James E Billie Dr, Hollywood, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.