BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Persinger, West Virginia. Completed plans call for site work for a water / sewer project.

Begin: 1.77 miles North of Junction (US 19 & WV 41) End: 0.06 mile South of Junction (US 19 & CO 19/66) Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must submit electronically with their bid a Proposal Guaranty Bond for $500.00 or 5% of the total bid, whichever is greater. The West Virginia Department of Transportation Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. The deferment, delay, postponement, and the date that proposals will be received and publicly opened. WVDOT - 019 - Drainage Improvements - Hawks Nest Cemetery Pipe Liner There are two (2) existing 60" CMP's, one running for 430 LF under US 19, and the second running for 124LF under Access Road #3 (Hilltop Drive). Both pipes have experienced excessive deteriorations and are in danger of plugging and causing protentional damage to the roadways and a potential hazard to the traveling public. The deteriorated pipe needs to be stabilized by liner and or bore and jack. There will be an construction pad on the outlet end of the US 19 pipe but will be built on an existing dump rock gutter that will require maintenance/ excavation from accumulated sediment. This rock gutter will be reestablished when the liner is installed and complete. The outlet end of the US 19 pipe and inlet end of the Hilltop Drive pipe will be cleared of accumulated debris etc. and the dump rock gutter between the two pipes will be reestablished as well.

GC Bidding

Water / Sewer

$400,000.00

Public - State/Provincial

Site Work

4

5

5

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
68
Bidding Soon
502
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

June 18, 2026

Project location map

Multiple Locations, Persinger, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.