Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 7, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a water / sewer project in Persinger, West Virginia. Completed plans call for site work for a water / sewer project.
Begin: 1.77 miles North of Junction (US 19 & WV 41) End: 0.06 mile South of Junction (US 19 & CO 19/66) Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must submit electronically with their bid a Proposal Guaranty Bond for $500.00 or 5% of the total bid, whichever is greater. The West Virginia Department of Transportation Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. The deferment, delay, postponement, and the date that proposals will be received and publicly opened. WVDOT - 019 - Drainage Improvements - Hawks Nest Cemetery Pipe Liner There are two (2) existing 60" CMP's, one running for 430 LF under US 19, and the second running for 124LF under Access Road #3 (Hilltop Drive). Both pipes have experienced excessive deteriorations and are in danger of plugging and causing protentional damage to the roadways and a potential hazard to the traveling public. The deteriorated pipe needs to be stabilized by liner and or bore and jack. There will be an construction pad on the outlet end of the US 19 pipe but will be built on an existing dump rock gutter that will require maintenance/ excavation from accumulated sediment. This rock gutter will be reestablished when the liner is installed and complete. The outlet end of the US 19 pipe and inlet end of the Hilltop Drive pipe will be cleared of accumulated debris etc. and the dump rock gutter between the two pipes will be reestablished as well.
GC Bidding
Water / Sewer
$400,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 19, 2026
June 18, 2026
Multiple Locations, Persinger, WV
Related To This Project
Persinger, WV
Bid Date: Apr 14 2026
Persinger, WV
Bid Date: Oct 28 2025
Persinger, WV
Bid Date: Sep 09 2025
Persinger, WV
--
Persinger, WV
Bid Date: Mar 11 2025
Persinger, WV
Bid Date: Feb 11 2025
Persinger, WV
--
Persinger, WV
Bid Date: May 09 2023
Persinger, WV
Bid Date: Feb 14 2023
Persinger, WV
Bid Date: Sep 13 2022
Persinger, WV
Bid Date: Nov 15 2022
Persinger, WV
Bid Date: Nov 15 2022
Cass, WV
Bid Date: May 19 2026
Kearneysville, WV
Bid Date: May 21 2026
Hurricane, WV
Bid Date: May 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
