Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 7, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a road / highway in Azalea Park, Florida. Design plans call for site work for a road / highway.
The project will enhance safety and operations at the intersection of State Road (SR) 551 (Goldenrod Road) and State Road (SR) 552 (Curry Ford Road) in Orange County. The scope includes rebuilding the existing traffic signal with new mast arm poles, upgrading pedestrian signals to support a Leading Pedestrian Interval and “No Turn on Red” blank-out signs, shortening pedestrian crossing distances through upgraded crosswalks, and reconstructing sidewalk curb ramps. Additional work includes adding a second northbound left-turn lane on Goldenrod Road, extending the southbound left-turn lane, upgrading raised islands between right-turn and through lanes, and raising crosswalks within right-turn lanes to improve pedestrian visibility and mobility.
Design
Roads / Highways
$2,600,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2028
FL-551 & State Hwy 552, Azalea Park, FL
Related To This Project
Azalea Park, FL
--
Azalea Park, FL
--
Azalea Park, FL
--
Azalea Park, FL
Bid Date: Mar 02 2026
Azalea Park, FL
--
Azalea Park, FL
--
Azalea Park, FL
Bid Date: Jan 05 2023
Village of Wellington, FL
--
Pine Hills, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
