BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a mixed-use development in Deerfield, Illinois. Completed plans call for site work for a playground / park / athletic field; and sidewalk / parking lot.

The scope of work includes minor removals, misc. concrete curbing, mill & asphalt overlay asphalt paving at the north parking lot of Jewett Park, crack fill, sealcoating and striping for the south parking lot of Jewett Park and the west parking lot of Woodland Park, crack fill and sealcoating of pathways at Floral, Jaycee, Maplewood and Clavey Park. Bids must be placed in a sealed envelope clearly marked "2026 District Wide Asphalt Projects". Each bid must include a ten percent (10%) Bid Guarantee and a duly executed and notarized Bid Certification under Section 33E-11 of the criminal code of 1961, as amended, on the form provided by the Deerfield Park District. Failure to provide Bid Certification within 48 hours of the bid opening shall be cause for rejecting the bid. No oral or telephone proposals or modifications will be considered. No bidder may withdraw their proposal after the hour set for the opening thereof, or before award of contract, unless said award is delayed for a period exceeding thirty (30) calendar days. All Bidders must comply with all provisions of the Prevailing Wage Ordinance #10-6. A certified payroll will be required from Bidders for all employees performing work at job site upon completion of the project. The Deerfield Park District may reject any or all of the bids on any basis and without disclosure of a reason. location Jewett Park North Parking Lot (Asphalt Work) 836 Jewett Park Drive Deerfield, IL 60015 Jewett Park South Parking Lot (Crack Fill, Sealcoat & Stripe) 836 Jewett Park Drive Deerfield, IL 60015 Woodland Park West Parking Lot (Crack Fill, Sealcoat & Stripe) 1425 Wilmot Road Deerfield, IL 60015 Floral Park Pathways (Crack Fill & Sealcoat) 951 Wilmot Road Deerfield, IL 60015 Jaycee Park Pathways (Crack Fill & Sealcoat) 1026 Wilmot Road Deerfield, IL 60015 Maplewood Park Pathways (Crack Fill & Sealcoat) 900 Clay Court Deerfield, IL 60015 Clavey Park Pathways (Crack Fill, Sealcoat) 1801 Montgomery Road Deerfield, IL 60015

Bid Results

Playgrounds / Parks / Athletic Fields

$99,950.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

June 12, 2026

Project location map

Multiple Locations, Deerfield, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.