Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 18, 2026 at 8:00 PM
Updated July 8, 2026
Demolition and site work for a mixed-use development in Saint Louis, Missouri. Completed plans call for the demolition of a 8,500-square-foot educational facility.
***As of June 18, 2026, the project was awarded to GreenTrac LLC but the awarded amount is not available.** Demolition of existing structures and site restoration at Scullin School, 4160 N Kingshighway Blvd, St. Louis, MO 63115. The scope includes the removal of asbestos containing materials (ACMs) and USEPA RCRA regulated hazardous materials from the Gym Addition prior to demolition under the base bid contract, specifically: flooring and mastic (8,500 SF), window systems, door caulk, 80 lighting fixtures, 30 hydraulic door closures, 6 CFCs water fountains, and all CFCs/Freon HVAC systems in the Gym Addition. The original Scullin school building is considered structurally unsound; therefore, traditional abatement and removal of RCRA items prior to demolition is not allowed. All debris from this building must be handled and treated as friable ACM waste. All work must comply with relevant USEPA, State of Missouri, and City of St. Louis asbestos regulations. All onsite workers in the regulated work zone must be MDNR licensed for asbestos removal activities. A HazMat consultant will be onsite daily to enforce compliance and conduct third party air monitoring as appropriate. The Gym Addition, being structurally sound, requires traditional asbestos abatement and removal of RCRA regulated items prior to demolition. Questions Due Date: Apr 30th 2026, 12:00 PM CDT Question Deadline Online Portal
Award
Educational
$1,000,000.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2026
June 8, 2026
To Be Determined, Saint Louis, MO
Related To This Project
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Jun 05 2026
Saint Louis, MO
Bid Date: May 15 2026
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Jun 02 2026
Saint Louis, MO
Bid Date: May 14 2026
Saint Louis, MO
Bid Date: Apr 09 2026
Saint Louis, MO
Bid Date: May 21 2026
Saint Louis, MO
Bid Date: May 08 2026
Saint Louis, MO
Bid Date: May 14 2026
Saint Louis, MO
Bid Date: May 08 2026
Saint Louis, MO
Bid Date: May 08 2026
Saint Louis, MO
Bid Date: Apr 29 2026
Saint Louis, MO
Bid Date: Jun 02 2026
Saint Louis, MO
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed