BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 14, 2026

Site work for a water / sewer project in Palm Desert, California. Completed plans call for site work for a water / sewer project.

1. The project consists of installing approximately 800 linear feet of 32-inch diameter fusible high density polyethylene (HDPE), 2,070 linear feet of 30-inch, 5,410 linear feet of 24-inch, 3,330 linear feet of 12-inch, 2,180 linear feet of 8-inch diameter water main pipe with restrained joints, including valves, fittings, polyethylene encasement, testing, disinfection, clearing and grubbing, excavation, imported sand, backfill and compaction of backfill, potholing all utility crossings, surface restoration and all necessary appurtenances complete and in place. The pipeline work also includes: excavation of jacking and receiving pits, shoring of trenches and pits as required, pipe jacking operations, horizontal directional drilling (HDD), and all related backfill and compaction. Portions of the pipeline will cross below ground the Union Pacific Railroad within a steel casing and the Coachella Valley Stormwater Channel (HDD) as indicated in the Contract Documents. 2. Desert View Trailer Park, Magdaleno Lopez, Campos MHP, Meza’s Ranch, Valley View Trailer Park, Vista Norte Estates, Valenzuela Luciano, and Soto Water remove connection to existing potable water system well and connect to the public water system and associated onsite work as indicated in the Contract Documents. 3. Desert View Trailer Park, Magdaleno Lopez, Campos MHP, Meza’s Ranch, Valley View Trailer Park, Vista Norte Estates, Valenzuela Luciano, and Soto Water remove connection to existing potable water system well and connect to the public water system and associated onsite work as indicated in the Contract Documents. 4. Furnish all labor, materials, and equipment necessary to perform and install street pavement and surface restoration as shown on the Drawings. 5. Apply and Obtain Encroachment Permit from the County of Riverside and Caltrans, including the preparation and implementation of Traffic Control Plans to be approved. 6. Prior to commencing work, Contractor shall notify Underground Service Alert (U.S.A., 811) of the proposed excavation. Contractor shall provide video documentation to CVWD of all existing condition, after marking utilities, for all the pre- and post-construction activities. Question Deadline 05/14/2026 at 5:00 PM PT Online Q&A Yes

GC Bidding

Water / Sewer

$16,800,000.00

Public - City

Site Work

44

20

3

3

Subscribe For Documents

102 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

August 3, 2026

Project location map

Palm Ct, Palm Desert, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.