Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 4, 2026 at 8:00 PM

Updated August 8, 2026

Site work for a water / sewer project in Palm Desert, California. Completed plans call for site work for a water / sewer project.

1. The project consists of installing approximately 800 linear feet of 32-inch diameter fusible high density polyethylene (HDPE), 2,070 linear feet of 30-inch, 5,410 linear feet of 24-inch, 3,330 linear feet of 12-inch, 2,180 linear feet of 8-inch diameter water main pipe with restrained joints, including valves, fittings, polyethylene encasement, testing, disinfection, clearing and grubbing, excavation, imported sand, backfill and compaction of backfill, potholing all utility crossings, surface restoration and all necessary appurtenances complete and in place. The pipeline work also includes: excavation of jacking and receiving pits, shoring of trenches and pits as required, pipe jacking operations, horizontal directional drilling (HDD), and all related backfill and compaction. Portions of the pipeline will cross below ground the Union Pacific Railroad within a steel casing and the Coachella Valley Stormwater Channel (HDD) as indicated in the Contract Documents. 2. Desert View Trailer Park, Magdaleno Lopez, Campos MHP, Meza's Ranch, Valley View Trailer Park, Vista Norte Estates, Valenzuela Luciano, and Soto Water remove connection to existing potable water system well and connect to the public water system and associated onsite work as indicated in the Contract Documents. 4. Furnish all labor, materials, and equipment necessary to perform and install street pavement and surface restoration as shown on the Drawings. 5. Apply and Obtain Encroachment Permit from the County of Riverside and Caltrans, including the preparation and implementation of Traffic Control Plans to be approved. 6. Prior to commencing work, Contractor shall notify Underground Service Alert (U.S.A., 811) of the proposed excavation. Contractor shall provide video documentation to CVWD of all existing condition, after marking utilities, for all the pre- and post-construction activities. Question Deadline 05/14/2026 at 5:00 PM PT Online Q&A Yes Award is subject to final approval.

Award

Water / Sewer

$18,521,227.00

Public - City

Site Work

44

24

12

6

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
124
Bidding Soon
2,003
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

August 3, 2026

Project location map

Palm Ct, Palm Desert, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed