Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 14, 2026
Site work for a water / sewer project in Palm Desert, California. Completed plans call for site work for a water / sewer project.
1. The project consists of installing approximately 800 linear feet of 32-inch diameter fusible high density polyethylene (HDPE), 2,070 linear feet of 30-inch, 5,410 linear feet of 24-inch, 3,330 linear feet of 12-inch, 2,180 linear feet of 8-inch diameter water main pipe with restrained joints, including valves, fittings, polyethylene encasement, testing, disinfection, clearing and grubbing, excavation, imported sand, backfill and compaction of backfill, potholing all utility crossings, surface restoration and all necessary appurtenances complete and in place. The pipeline work also includes: excavation of jacking and receiving pits, shoring of trenches and pits as required, pipe jacking operations, horizontal directional drilling (HDD), and all related backfill and compaction. Portions of the pipeline will cross below ground the Union Pacific Railroad within a steel casing and the Coachella Valley Stormwater Channel (HDD) as indicated in the Contract Documents. 2. Desert View Trailer Park, Magdaleno Lopez, Campos MHP, Meza’s Ranch, Valley View Trailer Park, Vista Norte Estates, Valenzuela Luciano, and Soto Water remove connection to existing potable water system well and connect to the public water system and associated onsite work as indicated in the Contract Documents. 3. Desert View Trailer Park, Magdaleno Lopez, Campos MHP, Meza’s Ranch, Valley View Trailer Park, Vista Norte Estates, Valenzuela Luciano, and Soto Water remove connection to existing potable water system well and connect to the public water system and associated onsite work as indicated in the Contract Documents. 4. Furnish all labor, materials, and equipment necessary to perform and install street pavement and surface restoration as shown on the Drawings. 5. Apply and Obtain Encroachment Permit from the County of Riverside and Caltrans, including the preparation and implementation of Traffic Control Plans to be approved. 6. Prior to commencing work, Contractor shall notify Underground Service Alert (U.S.A., 811) of the proposed excavation. Contractor shall provide video documentation to CVWD of all existing condition, after marking utilities, for all the pre- and post-construction activities. Question Deadline 05/14/2026 at 5:00 PM PT Online Q&A Yes
GC Bidding
Water / Sewer
$16,800,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2026
August 3, 2026
Palm Ct, Palm Desert, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
