Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 29, 2026 at 8:00 PM
Updated July 31, 2026
Renovation of a mixed-use development in Bedford, Massachusetts. Completed plans call for the renovation of a medical facility.
The work consists of upgrading twenty-five ceiling lift systems that have exceeded their service life by replacing existing equipment with Guldmann GH3+ ceiling lift systems. The contractor shall provide all labor, personnel, equipment, tools, materials, software, supervision, and services required to remove and replace motors, rails, and all supporting infrastructure securing the rails. The upgraded lift systems shall include an internal motor-mounted scale for enhanced maneuverability, a hand control with a display screen capable of showing patient weight and system information, and lift speeds of 2.2 inches per second or greater. One designated room requires installation of a trainer module to support gait training for rehabilitation. The contractor shall perform full project management, including development of detailed structural designs and drawings for each room in compliance with VA seismic and structural requirements, on-site coordination, installation, waste disposal, documentation delivery, and comprehensive onsite training for clinical and technical staff. All installation and training activities shall be coordinated with VA Healthcare Technology Management, comply with infection control, safety, security, and VA regulatory requirements, and be completed in a single scheduled visit as determined with the medical center. Location: Edith Nourse Rogers Memorial Veterans Hospital (Bedford VA Medical Center), 200 Springs Road, Bedford, MA 01730. Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed above Kurt Fritz The Contractor must provide all labor, personnel , equipment, tools, materials, software, supervision, and other items and services required to replace and install 25 ceiling lift systems at Bedford VAMC . The Contractor must provide all labor, personnel , equipment, tools, materials, software, supervision and other items and services necessary to perform the following: Upgrade of 25 Ceiling Lift systems at Bedford VAMC, including motor, rails, and all infrastructure securing the rails to Guldmann GH3+ systems Lifts shall have a scale that is internal to the motor to allow for maximum maneuverability and convenience when moving system over patient furniture Lifts shall come with a hand control that has a screen that can display the weight measured on the scale in addition to information about the lift, such as settings and maintenance requirements One of the rooms (227F-78) requires the trainer module feature to allow for gait training in rehabilitation Lifts must be able to lift at a speed of 2.2 inches per second or better
Sub-Bidding
Medical
$6,000,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2026
September 29, 2026
200 Springs Rd, Bedford, MA
Related To This Project
Bedford, MA
Bid Date: Apr 22 2026
Bedford, MA
Bid Date: Apr 22 2026
Bedford, MA
Bid Date: Apr 30 2026
Bedford, MA
Bid Date: Jun 03 2026
Bedford, MA
Bid Date: Jun 15 2026
Bedford, MA
Bid Date: Jul 29 2026
Bedford, MA
Bid Date: Jul 22 2026
Bedford, MA
Bid Date: Jun 10 2026
Bedford, MA
Bid Date: Jun 03 2026
Bedford, MA
Bid Date: Jun 03 2026
Bedford, MA
Bid Date: Apr 08 2026
Bedford, MA
Bid Date: Apr 07 2026
Bedford, MA
Bid Date: Apr 01 2026
Bedford, MA
Bid Date: Apr 02 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
