Site work and new construction of a water / sewer project in Jones, Oklahoma. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.

Sealed bids are requested for Water System Improvements for the Town of Jones City, Oklahoma, specifically for a Water Storage Tank at the intersection of Sullivan St and 5th St. There are two alternate bid options: Alternate Bid 1 includes a 40'-0" ID x 120' Standpipe, SCADA and controls integration, painting/coating system, disinfection, hydrostatic pressure testing and disinfection, various sizes of gate valves and boxes, reducers, installation of PVC water main (6" and 12"), bends, interconnections, tees, tapping sleeve and valve, cut and plug, erosion control, and traffic control. Alternate Bid 2 includes a 0.5 MG Composite Tower, SCADA and controls integration, painting/coating system, disinfection, valve vault, hydrostatic pressure testing and disinfection, various sizes of gate valves and boxes, reducers, installation of PVC water main (6" and 12"), gravel drive, bends, interconnections, tees, tapping sleeve and valve, cut and plug, erosion control, and traffic control. Compliance with Labor Standards Contract Provisions is mandatory. A bid bond of 5% of the total bid amount must be attached, serving as a guarantee that the successful bidder will, within ten days of notice of award, enter into contract and file the required bonds. No bid may be withdrawn for 45 days following the actual date of bid opening. The Owner reserves the right to reject any or all bids, waive irregularities or technicalities, and make awards in the Owner's best interest. Contractors must obtain plans and specifications from the Engineer and be registered on the Engineer's bid list to be recognized as eligible bidders. Compliance with requirements and regulations associated with project financing from the Oklahoma Water Resources Board FAP Bond loan is required. Equal Opportunity in Employment provisions apply. Proposals and modifications must be received at the designated office by the specified time. Late submissions will not be considered. Cost estimate: $2,500,000.00 - $3,900,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Results ALTERNATE BID 1 - STANDPIPE - Gerard Tank & Steel, Inc - $3,705,350.00 ALTERNATE BID 2 - COMPOSITE TANK - Gerard Tank & Steel, Inc - $4,062,950.00

Bid Results

Water / Sewer

$7,768,300.00

Public - City

New Construction, Site Work

24

21

17

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
84
Bidding Soon
1,207
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2026

June 29, 2026

Project location map

Multiple Locations, Jones, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.