Site work and new construction of a water / sewer project in Jones, Oklahoma. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.
Sealed bids are requested for Water System Improvements for the Town of Jones City, Oklahoma, specifically for a Water Storage Tank at the intersection of Sullivan St and 5th St. There are two alternate bid options: Alternate Bid 1 includes a 40'-0" ID x 120' Standpipe, SCADA and controls integration, painting/coating system, disinfection, hydrostatic pressure testing and disinfection, various sizes of gate valves and boxes, reducers, installation of PVC water main (6" and 12"), bends, interconnections, tees, tapping sleeve and valve, cut and plug, erosion control, and traffic control. Alternate Bid 2 includes a 0.5 MG Composite Tower, SCADA and controls integration, painting/coating system, disinfection, valve vault, hydrostatic pressure testing and disinfection, various sizes of gate valves and boxes, reducers, installation of PVC water main (6" and 12"), gravel drive, bends, interconnections, tees, tapping sleeve and valve, cut and plug, erosion control, and traffic control. Compliance with Labor Standards Contract Provisions is mandatory. A bid bond of 5% of the total bid amount must be attached, serving as a guarantee that the successful bidder will, within ten days of notice of award, enter into contract and file the required bonds. No bid may be withdrawn for 45 days following the actual date of bid opening. The Owner reserves the right to reject any or all bids, waive irregularities or technicalities, and make awards in the Owner's best interest. Contractors must obtain plans and specifications from the Engineer and be registered on the Engineer's bid list to be recognized as eligible bidders. Compliance with requirements and regulations associated with project financing from the Oklahoma Water Resources Board FAP Bond loan is required. Equal Opportunity in Employment provisions apply. Proposals and modifications must be received at the designated office by the specified time. Late submissions will not be considered. Cost estimate: $2,500,000.00 - $3,900,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Results ALTERNATE BID 1 - STANDPIPE - Gerard Tank & Steel, Inc - $3,705,350.00 ALTERNATE BID 2 - COMPOSITE TANK - Gerard Tank & Steel, Inc - $4,062,950.00
Bid Results
Water / Sewer
$7,768,300.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 28, 2026
June 29, 2026
Multiple Locations, Jones, OK
Related To This Project
Jones, OK
Bid Date: Jun 18 2026
Jones, OK
--
Jones, OK
--
Jones, OK
--
Jones, OK
--
Jones, OK
Bid Date: Feb 12 2026
Jones, OK
Bid Date: Feb 06 2026
Jones, OK
Bid Date: Jan 22 2026
Jones, OK
Bid Date: Jan 22 2026
Jones, OK
Bid Date: Dec 16 2025
Jones, OK
Bid Date: Dec 02 2025
Jones, OK
--
Jones, OK
Bid Date: Nov 20 2025
Jones, OK
Bid Date: Nov 20 2025
Jones, OK
Bid Date: Oct 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.