Published April 13, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Downers Grove, Illinois. Completed plans call for site work for a road / highway.

Request for Proposal for Design Build Contract RR-23-4920R Pavement and Structural Rehabilitation for Illinois Route 390 from M.P. 6.0 (U.S. Route 20/Lake Street) to M.P. 13.0 (I-290). Pursuant to CPO Notice 2023.12, only electronic submissions for competitive solicitations will be accepted. Paper responses will not be accepted. See the attached RFP for required documents. Description of the Work The Design-Builder shall be required to self-perform a minimum of 35% of the Construction Work in the Contract. Specifically, the Work under this Contract includes, but is not limited to: (I) Rehabilitation of existing mainline and ramp pavements including crack routing and sealing, shoulder microsurfacing, pavement patching and resurfacing; (II) Rehabilitation of existing mainline bridges including scarifying the bridge decks, deck slab repairs, reconstruction of expansion joints, placement of bridge deck latex concrete overlays, bridge deck grooving, extensions of existing parapets, PPC I-Beam Repairs, resetting and/or replacement of elastomeric expansion bearings at select locations, cleaning and painting of structural steel and bearings at select locations, structural repair of concrete at piers and abutments (as required), and slope wall repairs. The mainline bridges included in this project are as follows: • BN 1601 (SN 016-2565): IL Rte. 390 (eastbound) over Metra Railroad and Wetlands • BN 1602 (SN 016-2566): IL Rte. 390 (westbound) over Metra Railroad and Wetlands • BN 1602C: IL Rte. 390 over West Branch of DuPage River • BN 1603 (SN 016-2590): Northbound Gary Avenue (Ramp B) to eastbound IL Rte. 390 over IL Rte. 390 Ramp D • BN 1604 (SN 016-2589): IL Rte. 390 (westbound) to SB Gary Ave. (Ramp A) over IL Rte. 390 eastbound/westbound & Ramp D • BN 1605 (SN 016-2587): IL Rte. 390 (eastbound) over Springingsguth Road • BN 1606 (SN 016-2588): IL Rte. 390 (westbound) over Springingsguth Road • BN 1606A (SN 016-2576): IL Rte. 390 (westbound) Exit Ramp to SB Gary Ave. over Springingsguth Road • BN 1607 (SN 016-2591): IL Rte. 390 (eastbound) over Irving Park Road (IL Rte. 19) • BN 1608 (SN 016-2592): IL Rte. 390 (westbound) over Irving Park Road (IL Rte. 19) • BN 1609 (SN 016-2570): IL Rte. 390 (eastbound) over Rodenberg Road • BN 1610 (SN 016-2571): IL Rte. 390 (westbound) over Rodenberg Road • BN 1611 (SN 016-2568): IL Rte. 390 (eastbound) over Wright Boulevard • BN 1612 (SN 016-2569): IL Rte. 390 (westbound) over Wright Boulevard • BN 1613 (SN 016-2558): IL Rte. 390 (eastbound) over Mitchell Boulevard • BN 1614 (SN 016-2557): IL Rte. 390 (westbound) over Mitchell Boulevard • BN 1615 (SN 016-2560): IL Rte. 390 (eastbound) over Canadian Pacific Railroad Spur • BN 1616 (SN 016-2559): IL Rte. 390 (westbound) over Canadian Pacific Railroad Spur • BN 1619 (SN 022-0179): IL Rte. 390 (eastbound) over Meacham/Medinah Road • BN 1620 (SN 022-0222): IL Rte. 390 (westbound) over Meacham/Medinah Road Rehabilitation of crossroad structures including resetting and/or replacement of elastomeric expansion bearings at select locations, cleaning and painting of structural steel and bearings at select locations, structural repair of concrete at piers and abutments (as required), and slope wall repairs. The crossroad structures included in this project are as follows: • BN 1600 (SN 022-0208): US Rte. 20 (Lake Street) over IL Rte. 390 (eastbound) • BN 1618 (SN 016-2562): Plum Grove Road over IL Rte. 390 eastbound/westbound (IV) Repairs to existing concrete box culverts; (V) Repairs to existing retaining walls and noise abatement walls; (VI) Repairs to existing overhead sign structures; (VII) Repairs to existing Drainage Structures (VIII) Update roadway lighting; to meet grading standards and relocation of lighting controllers as required in specific areas (IX) Provide improvements to the drainage and underdrain systems at select locations; (X) Maintenance of Traffic including those for impacts to local facilities; (XI) Miscellaneous landscape, drainage and erosion control improvements; and (XII) Protect and/or relocation of utilities. 1.4.1 Status of the Work Right of Way (ROW): It is anticipated that no additional ROW (temporary or permanent) will be required for this Project. Environmental Permits and Approvals: The Illinois Tollway is determining the permits and approvals that may be required for the Project, including those that the Illinois Tollway may obtain and those that the Design-Builder should be required to obtain. Additional information is provided in Table 4-1 of Book 2, Section 4 (Environmental). Geotechnical: Additional geotechnical information may be required for the Project. Utilities: There are no anticipated private or public utility relocations planned as part of the Project’s scope. The Purchasing Agent shall be the sole point of contact for the Illinois Tollway during the procurement, except for assistance with registration in BidBuy, submitting electronic Proposals or accessing the Online Plan Room as provided in Section 3.5 (BidBuy and Online Plan Room). Contact Information: The Illinois Tollway Purchasing Agent Email: skelly@getipass.com Question Deadline 06/15/2026

GC Bidding

Roads / Highways

$60,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
600
Active Projects
287
Bidding Soon
4,733
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2026

November 9, 2026

Project location map

Route 390, Downers Grove, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.