BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 14, 2026

Site work for a road / highway in Grande Prairie, Alberta. Completed plans call for site work for a road / highway.

1. 115 Ave & 99 St (Site A1) - Complete replacement of traffic signal. New installations include - traffic signal (TS) cabinet with UPS, power distribution (PD) cabinet, 2 cabinet bases, 3 patio blocks, 4 signal poles (11m, 13m, 15m, 15m) with bases, one (1) 4-camera Autoscope Vision system, 10 signal heads, 8 ped signal heads, 8 APS pushbuttons, 15 signs, 4 junction boxes (JB), 65m trenched conduits, 96m pushed conduits, completely new field wiring (entire intersection). Removals include - TS cabinet & base, 4 signal poles w/ fixtures, 4 pole bases, 4 JBs, pull out all existing cables (through approx. 167m of conduit runs). 2. 89 Ave & 108 St (Site A2) – New installations include - TS cabinet w/ UPS, 1 cabinet base, 2 patio blocks, 53m trenched conduits, 129m pushed conduits, 2 pedestal poles with bases, 4 JBs, 4 ped signals, 4 pushbuttons (PPB), completely new field wiring (entire intersection). Removals include - TS cabinet & base, 4 JBs, pull out all existing cables (through approx. 165m of conduit runs), salvage 1 ped signal head and 1 pushbutton. 3. 92 Ave & 108 St (Site A3) – New installations include - TS cabinet w/ UPS, PD cabinet, 2 cabinet bases, 3 patio blocks, 2 streetlight davit w/ luminaries, 52m trenched conduits, 125m pushed conduits, 4 JBs, completely new field wiring (entire intersection). Removals include - TS cabinet & base, 4 JBs, pull out all existing cables (through approx. 175m of conduit runs). 4. 79 Ave & 108 St (Site A4) – New installations include - PD cabinet w/ UPS (Alpha) with base and 1 patio block, 47m trenched conduits, 3 JBs, new streetlight cables, rewire all streetlights to PD Cabinet. Removals include – PD Cabinet & base, 3 JBs, pull out existing ATCO streetlight cables (through approx. 200m of conduit runs), salvage 2 ped signal heads and 2 PPBs. 5. 99 Ave & 100 St (Site A5) – New installations include - 1 pole base, salvage and re-install 1 streetlight pole w/ fixtures, 3 bollards (salvage, refurbish and re-install), install new conduits to AC Power Source (34m trenched 37m pushed), 2 new JBs. Removal – 1 JB, breakout and reinstate 12 sq.m of sidewalks/alley concrete driveway, 9 sq.m of asphalt parking lot surface & 5 sq.m of paving stone sidewalk. Removal of 1 steel helix pole base, refurbish 3 bollards 6. 97 Ave & 116 St (Site A6) – New installations include - Adjust / correct plumb of TS cabinet, repair weld defect of a pole (jib flange weld to mast arm), 1 city-supplied PPB pole with 1 pedestal pole base (S&I), 3 JBs (2 are 24” deep), 3m trenched conduits. Removals include – 3 JBs, 2 PPBs. Approximate Quantities: 1) Salvage signal pole / streetlight poles and attached fixtures, remove bases – 5 poles 2) Salvage pedestrian signal heads – 3 ea. 3) Salvage pushbuttons – 5 ea. 4) Salvage traffic cabinet & base – 3 ea. 5) Salvage power distribution cabinet & base – 1 ea. 6) Remove junction box in sidewalk – 19 ea. (1 in sidewalk, 18 in boulevard) 7) Remove existing cables / wiring (through length of conduit runs) – 535m 8) Remove streetlight cables and re-wire new streetlight cable to power distribution cabinet – 200m 9) Supply & install cantilever combination pole w/ bases & Streetlight extension davits – 4 nos. (1-11m, 1-13m, 2-15m) 10) Weld fib flange to mast arm – 1 l.s. 11) Supply & install pedestal pole w/ bases – 4 ea. (3-4m tall, 1-1.2m tall) 12) Supply & install streetlight extension davit with luminaries – 2 ea. 13) Supply & install streetlight pole base – 1 ea. 14) Supply & install traffic signal cabinet with UPS w/ base – 3 ea. 15) Supply & install power distribution cabinet w/ base – 2 w/o UPS, 1 w/ UPS (Alpha) 16) Adjust / Correct plumb of TS Cabinet – 1 l.s. 17) Supply & install signal head – 10 ea. 18) Supply & install pedestrian signal head – 12 ea. 19) Supply & install accessible pedestrian system pushbutton – 8 ea. 20) Supply & install pedestrian pushbutton – 4 ea. 21) Supply & install Autoscope Vision 4-Camera System – 1 l.s. 22) Install salvaged preemption receiver and radio – 1 pole 23) Install salvaged pedestrian signal head – 3 ea. 24) Install salvaged pushbuttons – 5 ea. 25) Supply & install signs – 15 nos. (including 4 streetname signs) 26) Trenched conduits – 256m 27) Supply & install Trenched conduits in concrete / asphalt surface – 52m 28) Supply & install Pushed conduits – 387m 29) Supply & install junction boxes 20 ea. (4-M, 8-L, 1-L-24”, 5-O, 2-O-24” deep) 30) Sawcut, breakout concrete/asphalt/paving stone area and reinstate – 47 sq.m (concrete-12 sq.m, asphalt-30sq.m, paving stone – 5 sq.m) 31) Salvage, refurbish and re-install bollards – 3 ea. 32) Field Wiring - 6 sites (3 sites complete re-wire, 3 sites minor rewire, 1 site very minor wiring) 33) Mobilization – 6 sites 34) Site Rental – 6 sites 35) Traffic and Pedestrian Accommodation – 6 sites 36) Coordination with ATCO Electric – 6 sites Documents can be obtained from https://cityofgp.bidsandtenders.ca/

Bid Results

Roads / Highways

$1,212,000.00

Public - City

Site Work

30

9

4

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
9
Bidding Soon
60
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2026

June 1, 2026

Project location map

Multiple Locations, Grande Prairie, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.