BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Deland, Florida. Conceptual plans call for site work for a road / highway.

The Department has conducted a traffic study and determined that a new traffic signal is warranted at the intersection of the I-75 northbound exit ramp and County Road (C.R.) 475 in Sumter County. The project scope includes the design and installation of a new traffic signal system as part of the Traffic Operations Pushbutton Program, along with upgraded intersection lighting to improve visibility, safety, and overall traffic operations, particularly during nighttime conditions.

Conceptual

Roads / Highways

$500,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
411
Active Projects
182
Bidding Soon
2,724
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.