Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work and paving for a road / highway in Campton Hills, Illinois. Completed plans call for site work for a road / highway.

This improvement consists of cleaning and sealing of any cracks, voids orjoints 2" (50mm) in width orless with asphalt cement reinforced by polypropylene fibers. The work will be performed on various City streets asindicated in these specifications and as directed by the Engineer. Some of the street locations will require cleaning and sealing the curb-line joint and other locations will have the curb-line joint omitted from the scope of this work. The location list included with thisspecification will indicate which street locations will require curb-line sealing. This contract shall include all of the necessary labor, equipment, materials and traffic control required to complete this fiberized crack filling work. Question Deadline 04/20/2026 at 8:00 AM CT Questions due prior to Procurement@stcharlesil.gov Anticipated Award Date June 2026 The City of St. Charles is requesting bids from contractors for the 2026 Crack Filling Program. This work consists of cleaning and sealing any cracks, voids, or joints 2 inches (50 mm) in width or less with asphalt cement reinforced by polypropylene fibers.

Award

Roads / Highways

$108,558.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
602
Active Projects
249
Bidding Soon
4,129
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 2, 2026

Project location map

Multiple Locations, Campton Hills, IL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed