BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a bridge / tunnel in Stinson Beach, California. Conceptual plans call for site work for a bridge / tunnel.

The project involves a request for Coastal Development Permit and Design Review approval to construct a new pedestrian bridge over Fitzhenry Creek connecting the Stinson Beach Community Center facilities located at 30 Belvedere Avenue and 10 Willow Avenue. The proposal also includes rebuilding two existing community center structures on one parcel in the same location and at the same height. The pedestrian bridge is proposed to be approximately 7 feet wide and 34 feet long, with an overall bridge and ramp system length of approximately 50 feet and a height of about 15 feet above the creek bed. Construction includes drilled concrete piers, grade beams, and a cedar bridge deck with hog wire guards and railing. Informational Coverage: This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com.

Conceptual

Bridges / Tunnels

$2,500,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
432
Active Projects
183
Bidding Soon
3,332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2026

Project location map

30 Belvedere Ave & 10 Willow Ave, Stinson Beach, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.