Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 12, 2026 at 8:00 PM
Updated May 15, 2026
Site work for a civil project in Orlando, Florida. Completed plans call for site work for a road / highway.
Road Name: Northern Turnpike Cctv Upgrades - Its Surveillance System Limits: 11470024 Total Roadway Length: 10.079 Miles Contract Days: 329 Total Bridge Length: 0.000 Miles Total Proposal Length: 10.079 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Description: Work consists of providing all labor, materials, equipment and incidentals necessary for installation of additional CCTVs to provide better operational awareness during regular congestion and emergency scenarios along the turnpike roadway system within Osceola, Seminole, Orange, Polk, and Sumter Counties including State Road (S.R.) 91 at mileposts (M.P.) 244.0, 263.3, 300.2, and 260.8; S.R. 417 at M.P. 2.9, 49.2, and 52.0; S.R. 429 at M.P. 6.0; S.R. 528 at M.P. 4.6; S.R. 570 at M.P. 0.0, and 24.5; Turkey Lake Service Plaza; and Okahumpka Service Plaza. No Pre-Bid Conference. Contractor must be prequalified. Question Deadline 05/06/2026 at 5:00 PM ET, Direct all questions to the Department by posting them to the Department's website. Questions posted to this site before 5:00 P.M. (EST) on the tenth calendar day prior to the bid opening, will be responded to by the Department. For questions posted after this deadline, an answer cannot be assured. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 005 - Electrical - Osceola, Seminole, Orange, Polk, Sumter
Post-Bid
Roads / Highways
$5,143,218.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2026
May 22, 2026
Multiple Locations, Orlando, FL
Related To This Project
Orlando, FL
Bid Date: May 12 2026
Orlando, FL
Bid Date: May 12 2026
Orlando, FL
Bid Date: May 27 2026
Orlando, FL
Bid Date: May 12 2026
Orlando, FL
Bid Date: May 12 2026
Orlando, FL
--
Orlando, FL
--
Orlando, FL
Bid Date: May 19 2026
Orlando, FL
--
Orlando, FL
Bid Date: Jun 04 2026
Orlando, FL
Bid Date: May 12 2026
Orlando, FL
Bid Date: Jun 01 2026
Orlando, FL
Bid Date: Jun 18 2026
Orlando, FL
Bid Date: May 21 2026
Orlando, FL
Bid Date: Jun 04 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
