BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 19, 2026

Site work for a water / sewer project in Cleburne, Texas. Completed plans call for site work for a water / sewer project.

Fm 4 to Gardega Road 16" Water Extension :- Installation of approximately 7,100 linear feet of 16-Inch PVC water transmission line, and associated appurtenances, by open cut and by bore. Question Deadline 05/01/2026 at 12:00 PM CT Any questions or communications shall be in writing. Written questions may be submitted through the website or directed to the purchasing agent in writing (purchasing@cleburne.net) and answers will be posted through Civcast. A. The major work shall consist of furnishing all labor, equipment, supplies, fuel, etc. associated with the FM 4 to Gardega 16" Water Extension as specified in this document and the construction plans, complete and in place. B. It shall be the responsibility of the prospective bidder to visit the project sites and make such examinations and explorations as may be necessary to determine all conditions that may affect construction of this project. C. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during preparation of the Proposal and all unusual conditions that may give rise to later contingencies should be brought to the attention of the City prior to the submission of the Proposal. D. Horizontal and vertical control will be set by the contractor prior to construction. Construction staking will be the responsibility of the contractor. No separate pay item is included for construction staking. The work will be performed subject to the right of inspection by the City Engineer or his authorized representative. Any provision of the agreement vesting in the City of Cleburne or engineer the right of supervision or inspection is understood by all the parties to be for the purpose of ensuring that the plans and specifications are complied with and that the completed work is obtained as described, and no such provision shall be interpreted as vesting in the City of Cleburne or engineer the right to control the details of the work. E. The Contractor shall maintain at all times on the job site, a superintendent authorized to receive and execute instructions from the engineer. F. The Contractor shall employ only competent, efficient workmen and shall not use on the work any unfit person or one not skilled in the work assigned to him; and shall at all times maintain good order among his employees. Completion- 360 calendar days.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

46

12

7

7

Subscribe For Documents

102 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
398
Active Projects
170
Bidding Soon
3,060
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2026

June 8, 2026

Project location map

Multiple Locations, Cleburne, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.