BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of an educational facility in Salt Lake City, Utah. Completed plans call for the renovation of a educational facility.

The purpose of this solicitation is to solicit responses to enter into a contract with a qualified vendor to obtain the products and/or services listed for Salt Lake Community College. After reviewing the submitted responses, the College may choose not to proceed with the procurement. QUESTIONS DEADLINE TUESDAY, APRIL 21, 2026 3:00 pm The Work consists of the following: 1. The Work includes removal and replacement of selected glazing, glazed assemblies and metal panel, at buildings located on the Jordan, Miller and Redwood Campus locations, see scope matrix and Repair Legend sheet G-003. Match existing tint of windows at all locations. At the Redwood campus the work includes the replacement of Clerestory Insulated Window systems: Facility-48 Trades Building-A; (14) at 24'-0" (2) at 29'-0" . Facility-49 Trades Building-B; (6) at 24'-0". Facility-52 Trades Building-C; (3) at 24'-0". See drawings A-110, A-111, A-201, A-501, A-502, and A-503 for locations, details and photographs. On the South Jordan Campus: At the High Tech Center (JHTC); the replacement of (10) curtainwall window panes (insulated glazing) being replaced at the curvilinear wall of the south facade. These are custom curved and tinted. The Health Sciences building (JHS); the replacement of (2) damaged curtain panel (custom metal) on the west facade above the lower roof. The Heat Plant Distribution Building; (5) insulated window panes. See drawings A-113, A-114, A-115, and A-116 for locations, details and photographs. The work also includes at the Miller campus: The Professional Development Center (MPDC); (1) broken insulated window pane, in the N/E facade. The Free Enterprise Center (MFEC); has the replacement of (3) rows of insulated windows in the N/E corner facade, (3) insulated window panes in the N/W corner, second row from the top, and the top triangular section (also insulated). (1) insulated window pane to be replaced in the S/W corner, and the 3 rd row insulated window panes to be replaced. At the Automotive Training Center (MATC); the replacement of (2) insulated panes at the West facade with the 3 rd row of insulated panes. See drawings A-117, A-118, A-119, and A-121 for locations, details, and photographs.

Post-Bid

Educational

$450,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
94
Bidding Soon
989
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2026

May 28, 2026

Project location map

Multiple Locations, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.