BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a road / highway in New Haven, Michigan. Completed plans call for site work for a road / highway.

Removal and installation of special polyurea pavement markings at various locations in Macomb County. This is a pavement marking project involving county-wide removal and installation of special polyurea pavement markings including stop bars, crosswalks, arrows, legends, and railroad crossings. May require state DOT prequalification with N3 pavement marking classification and 5% bid bond. Question Deadline 04/20/2026 at 4:00 PM ET All inquiries should be submitted through electronically. Questions submitted by e-mail, in-person and/or telephone will not be answered. Stop Bars and Crosswalks: Waterborne, hot tape, cold tape and thermoplastic markings must be removed, recessed, and re-applied using Recessed Polyurea at a minimum dry thickness of 45 Mils with retroreflective beads placed per manufacturers recommendation and at the direction of the Macomb County Department of Roads inspector or engineer (reference the latest MCDR's Special Pavement Marking Specs). Special Legend Pavement Markings: Waterborne, hot tape, cold tape and thermoplastic markings must be removed, scarified, and re-applied using Polyurea at a minimum dry thickness of 45 Mils with retroreflective beads placed per manufacturers recommendation at the direction of the Macomb County Department of Roads inspector or engineer (reference the latest MCDR's Special Pavement Marking Specs). Scope area: Complete log/lists of locations county-wide provided by the MCDR, including stop bars, crosswalks, RR crossings, school zones, and roundabout markings. If there are no available logs, the general plan is to start at one end of a county road and proceed down its length, completing locations with less than 60% of the markings in place. Once that county roadway is complete, move on to the next roadway, as directed by the MCDR inspector or engineer. Maintaining Traffic: The contractor must follow the current MMUTCD and MDOT Maintaining Traffic Typical. Most of the contract is 5 lane roads with left turn lanes and some with right turn lanes.

Post-Bid

Roads / Highways

$2,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
193
Bidding Soon
1,995
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2026

June 26, 2026

Project location map

Multiple Locations, New Haven, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.